[1]
Umeesh Kumar Suppramaniam, S. et al. 2018. Causes of delay in the construction phase of oil and gas projects in Malaysia. International Journal of Engineering and Technology. 7, 2.29 (May 2018), 203–209. DOI:https://doi.org/10.14419/ijet.v7i2.29.13318.