[1]
Chien, Y.-H. and Chiang, C.-P. 2018. Optimal Age for Preventive Replacement of A System with GPP Repair Process.
International Journal of Engineering and Technology
. 7, 4.38 (Dec. 2018), 1627–1629
. DOI:https://doi.org/10.14419/ijet.v7i4.38.29219
.