(1)
Subramani, T.; Sivakumar, P. Analysis Cost Overruns, Delays and Risk Involved in Construction Management Using Primavera.
IJET
2018
,
7
(3.10), 160-163.
https://doi.org/10.14419/ijet.v7i3.10.15651
.