Joseph Kalayathankal, S., Varghese Kureethara, J., & T. Abraham, J. (2018). A modified fuzzy approach to prioritize project activities.
International Journal of Engineering and Technology
,
7
(2.6), 158-162.
https://doi.org/10.14419/ijet.v7i2.6.10143