Kim, J., & Won, J. (2018). Construction Period Analysis of HPC Method by PC Construction Project Cases in KOREA.
International Journal of Engineering and Technology
,
7
(3.7), 440-443.
https://doi.org/10.14419/ijet.v7i3.7.18901