Pour, N. S., Zeynali, S., & Kheradmand, M. (2012). Calculating the Fuzzy Project Network Critical Path.
International Journal of Engineering and Technology
,
1
(2), 58-66.
https://doi.org/10.14419/ijet.v1i2.43