Al-Hazim, Nabil, and zaydoun abusalem. 2015. “Delay and Cost Overrun in Road Construction Projects in Jordan”.
International Journal of Engineering and Technology
4 (2): 288-93.
https://doi.org/10.14419/ijet.v4i2.4409
.