Chien, Yu-Hung, and Chung-Piao Chiang. 2018. “Optimal Age for Preventive Replacement of A System With GPP Repair Process”.
International Journal of Engineering and Technology
7 (4.38): 1627-29.
https://doi.org/10.14419/ijet.v7i4.38.29219
.