Subramani, T. and Sivakumar, P. (2018) “Analysis Cost Overruns, Delays and Risk Involved in Construction Management Using Primavera”,
International Journal of Engineering and Technology
, 7(3.10), pp. 160–163.
doi:10.14419/ijet.v7i3.10.15651
.