Chien, Y.-H. and Chiang, C.-P. (2018) “Optimal Age for Preventive Replacement of A System with GPP Repair Process”,
International Journal of Engineering and Technology
, 7(4.38), pp. 1627–1629.
doi:10.14419/ijet.v7i4.38.29219
.