Pour, N.S., Zeynali, S. and Kheradmand, M. (2012) “Calculating the Fuzzy Project Network Critical Path”,
International Journal of Engineering and Technology
, 1(2), pp. 58–66.
doi:10.14419/ijet.v1i2.43
.