J, Rajprasad, et al. “A Study on Multiple Crew Based Productivity Scheduling Method in Construction Projects”.
International Journal of Engineering and Technology
, vol. 7, no. 2.12, Apr. 2018, pp. 454-8,
https://doi.org/10.14419/ijet.v7i2.12.11516
.