Adly Ishak, Fadzil, et al. “A Case Study of LEAN Application for Shortest Lead Time in Composite Repair Shop”.
International Journal of Engineering and Technology
, vol. 7, no. 4.13, Oct. 2018, pp. 112-9,
https://doi.org/10.14419/ijet.v7i4.13.21341
.