Application of The MODAPTS Method with Innovative Solutions in The Cement Packing Process

  • Authors

    • Cut Ita Erliana
    • Dahlan Abdullah
    2018-04-08
    https://doi.org/10.14419/ijet.v7i2.11249
  • MODAPTS, Operator's Movement, Movement Activities, Terminal Activities, Standard Time, Normal Time
  • Abstract

    The Modular Arrangement of Predetermined Time Standard (MODAPTS) is a medote for analyzing performance in performing work by monitoring the operator's movement in the workplace. MODAPTS will record the movement of each carrier in the workplace. This research will reveal a number of common features of MODAPTS and its applications in the packing process at the cement plant in particular to reduce the waste of working time that causes the production target is not achieved. This Cement Packing process becomes the chosen workplace because it requires manual work where there is continual movement of the body. The suggested improvement is in the form of determining movement activities, terminal activities, and Auxiliary Activities for each operator based on the standard time and the normal time available. Based on the results of this study obtained innovative solution that can be used as a safe, easy, and efficient working procedure resulting in increased work productivity.

     

  • References

    1. [1] Heyde G C C (1966), MODAPT Plus. Heyde Dynamics Pty Ltd

      [2] International MODAPTS Association, Inc. Kalamazoo, Ml: MODAPTS http://www.modapts.org/bylaws.htm, 25.05.2012

      [3] Brnada S, Sabaric I & Kovacevic S (2010), Application of MODAPTS Method in The Warping Process. Proceedings of the 4th International Conference ERGONOMICS, 143-150

      [4] Karger D W & Bayha F H (1987), Engineering Work Measurement. Industrial Press Inc., New York

      [5] Hirano H (1996), 5 Pillars of The Visual Workplace. Productivity Press Inc., Portland

      [6] Kobayashi I (1996), Material, Notes and Papers. PPORF Development Institue, Japan

      [7] Cho H J & Park J I (2012), Methodology of Estimating Assembly Cost by MODAPTS. International Journal of Information and Communication Engineering 6(3), 544-548

      [8] Cho H J, Lee S & Park J I (2014), Time Estimation Method for Manual Assembly Using MODAPTS Technique in The Product Design Stage. International Journal of Production Research 52(12), 3595-3613

      [9] Golpra H (2013), Estimation Duration of Projects Manual Tasks Using MODAPTS Plus Method. Int. J. Research in Industrial Engineering 2(1), 12-19

      [10] Wu S, Wang Y, BolaBola J Z, Qin H, Ding W & Wen W (2016). Incorporating Motion Analysis Technology into Modular Arrangement of Predetermined Time Standard (MODAPTS). International Journal of Industrial Ergonomisc 53, 291-298

      [11] Razmi J & Niyaee S (2008), Developing a Spesific Predetermined Time Study Approach: An Empirical Study in a Car Industry. Prod. Plan. Control Manag. Operations 19(5), 454-460

      [12] Cho H J & Park J I (2014), Motion-Based Method for Estimating Time Required to Attach Self-Adhesive Insulators. Computer-Aided Des 56(11), 68-87

  • Downloads

  • How to Cite

    Ita Erliana, C., & Abdullah, D. (2018). Application of The MODAPTS Method with Innovative Solutions in The Cement Packing Process. International Journal of Engineering & Technology, 7(2), 470-473. https://doi.org/10.14419/ijet.v7i2.11249

    Received date: 2018-04-07

    Accepted date: 2018-04-07

    Published date: 2018-04-08