Evaluation of Water Resources Management in Construction Industry – A Model Study

  • Authors

    • D Prasanna Kumar
    • A Satish
    • S S. Asadi
    2018-03-18
    https://doi.org/10.14419/ijet.v7i2.7.12301
  • Construction Project Management, Water Resources, Resource Management, AHP Model.
  • Construction projects need to be executed to a prefixed time schedule and with the estimated cost according to the plan among all these before starting the project all we need to see was water resources if the resources are not available we cannot start the project. The research was developed in water resources management the techniques, limitations, the future purpose work the overview of all the methods need to be covered. Business have increased now a days to get the additional advantage to the construction project all we need to do was select the area which have surrounding water supplies, underground water level, occurrence of the rainfall all these conditions need to be considered before the construction of the project. While the construction of the project water treatment plants has to be constructed the water used for the household purpose can be reuse by fallowing the treatment techniques. Ground water recharge techniques also have to be implementing to increase the level. The water resource management gives extra benefit to the project the initial cost of these treatment plants will be more but in the future there will be more benefited. This paper describes and finds issues in the water resource management in construction projects and also taken many options of engineers, project managers, people who are living in the local area, site engineers, and irrigation officers. The gathered information from the questionnaire survey is analyzed in AHP Model and developed the importance of the alternatives derives from the issues. This will be helpful for the employees of construction project managers and also to the people who are wasting more water the techniques need to fallow and how to use them and how to treat them how to save water will be considered.

     

  • References

    1. [1] G. Emre Gurcanli, Harun Turkoglu, SenemBilir Heavy Equipment Scheduling for Horizontal Construction Projects Procedia Engineering 182 (2017) 265 – 273

      [2] SK. Nagaraju, Prof. A. Ray Chaudhuri, B. Sivakonda Reddy Resource Management in Construction Projects – a case study, Engineering Science and Technology: An International Journal (ESTIJ), ISSN: 2250-3498, Vol.2, No. 4, August 2012

      [3] Zaharah Binti Manaf& Muhammad NajibRazali, The Management Of Plant And Machinery At Construction Site: It‟s Impact On The Completion Time OfConstruction Projects, Management in Construction Researchers Association Conference (MICRA), 3-4 October 2007, University Malaya, Kuala Lumpur.

      [4] Prajeesh. V. P , Mr. N. Sakthivel, Management of Equipment & Machinery in Construction, IJISET - International Journal of InnovativeScience, Engineering & Technology, Vol. 3 Issue 5, May 2016.

      [5] Ximena Ferradaa, Daniela Núñezb, Andrés Neyemb, Alfredo Serpellc, Marcos Sepúlvedab, A lessons-learned system forconstruction projectmanagement: a preliminary application, Procedia - Social and Behavioral Sciences 226 (2016) 302 – 309

      [6] M. K. Kurdia, A.H. Abdul-Tharim,N. Jaffar, M.S. Azli, M.N. Shuib, A.M. AbWahid, Outsourcing in Facilities Management- A Literature Review, Procedia Engineering 20 (2011) 445 – 457

      [7] Dave Collins and Antje Junghans, Sustainable facilities management and green leasing: The company strategic approach, Procedia Economics and Finance 21 (2015) 128 – 136

      [8] Ekaterina Nezhnikova a, the use of underground city space for the construction of civil residential buildings, Procedia Engineering 165 (2016) 1300 – 1304

      [9] Ken Ammon, Tommy Strowd, Joel VanArman, Integrated Water Resources Management--South Florida‟s Experience, World Environmental and Water Resources Congress 2007.

      [10] Robert Willis, Brad A. Finney, Daoshuai Zhang, Water Resources Management In North China Plain, ournal of Water Resources Planning and Management, Vol. 115, No. 5, September, 1989.

      [11] Kallakunta Ravi Kumar, SS. Asadi, Venkata Ratnam Kolluru.“Remote Sensing And Gis Based Land Utilization Analysis: A Model StudyfromVamsadhara River Basin†International Journal of Mechanical Engineering and Technology (IJMET),Volume 8, Issue 11, November 2017, pp. 866–873.

      [12] SS.Asadi, M. Siva Krishna Reddy“Materials Management Of Power Transmission Line Construction Project: A Model Study From Rampura To Jagulur Power Transmission Line Constructionâ€International Journal of Mechanical Engineering and Technology (IJMET) Volume 8, Issue 11, November 2017, pp. 67–77.

      [13] SS. Asadi, PV. Praneeth “A Comparative Study For Evaluation Of Different Form Work Systems Utilization In Construction Projects†International Journal of Mechanical Engineering and Technology (IJMET),Volume 8, Issue 11, November 2017, pp. 21–29.

  • Downloads

  • How to Cite

    Prasanna Kumar, D., Satish, A., & S. Asadi, S. (2018). Evaluation of Water Resources Management in Construction Industry – A Model Study. International Journal of Engineering & Technology, 7(2.7), 1111-1115. https://doi.org/10.14419/ijet.v7i2.7.12301