The development of simulation model on environmental uncertainty factors for interval project completion

  • Authors

    • Zirawani Baharum
    • Yuvendra Rao Venkatesan
    • Syazwa Nabila Mohd Raidzuan
    • Muhammad Imran Qureshi
    2018-05-22
    https://doi.org/10.14419/ijet.v7i2.29.13130
  • NOT AVAILABLE
  • Abstract

    The construction industry has many underlying causes of uncertainty that has impact on late delivery of project completion's performance as well as in time management. The issue on uncertainty delays directly impact the project performance that leads into unnecessary time extension. The objective of the research is the way to create a valid model towards the environmental uncertainty factors. Therefore, this research is conducted to identify the impact of environmental issues which affect the period of project completion using the Witness software system. A literature review revealed the types of other uncertainty factors that affect the project completion by using other software’s such as Monte Carlo analysis and relative important index. This research is intended to measure the impact of each environmental factor using the Witness software system by evaluating their significant level of each. The significant level of the factors was determined by using the SPSS statistics software tools. The model will help to manage the time and costing factors by reducing the main impact from the environment. This will aid all project contractors in managing their resources and time utilities.

     

  • References

    1. [1] Qureshi MI, Bashir N, Zaman K, Sajjad N, Fakhr S. Customer Satisfaction Measurement and Analysis using six sigma in Telecom sector of Pakistan. European Journal of Sustainable Development. 2012;1(1):53.

      [2] Assaf SA, Al-Hejji S. Causes of delay in large construction projects. International journal of project management. 2006;24(4):349-57.

      [3] Saleh A, Abdelnaser O, Abdul H, editors. Causes of delay in construction industry in Libya. The International Conference on Economics and Administration, Faculty of Administration and Business, University of Bucharest, Romania: ICEA–FAA Bucharest; 2009.

      [4] Assaf SA, Al-Khalil M, Al-Hazmi M. Causes of delay in large building construction projects. Journal of management in engineering. 1995;11(2):45-50.

      [5] Wei KS. Causes, effects and methods of minimizing delays in construction projects. A project report. 2010.

      [6] Aibinu AA, Odeyinka HA. Construction delays and their causative factors in Nigeria. Journal of construction engineering and management. 2006;132(7):667-77.

      [7] Arditi D, Akan GT, Gurdamar S. Reasons for delays in public projects in Turkey. Construction management and economics. 1985;3(2):171-81.

      [8] Chan DW, Kumaraswamy MM. A comparative study of causes of time overruns in Hong Kong construction projects. International Journal of project management. 1997;15(1):55-63.

      [9] Kumaraswamy MM, Chan DW. Contributors to construction delays. Construction Management & Economics. 1998;16(1):17-29.

      [10] Ling FYY, Hoi L. Risks faced by Singapore firms when undertaking construction projects in India. International Journal of Project Management. 2006;24(3):261-70.

  • Downloads

  • How to Cite

    Baharum, Z., Rao Venkatesan, Y., Nabila Mohd Raidzuan, S., & Imran Qureshi, M. (2018). The development of simulation model on environmental uncertainty factors for interval project completion. International Journal of Engineering & Technology, 7(2.29), 62-66. https://doi.org/10.14419/ijet.v7i2.29.13130

    Received date: 2018-05-21

    Accepted date: 2018-05-21

    Published date: 2018-05-22