Measuring Severity of Downtime Influence Factors to Naval Ship Operational Availability: A Delphi Study
-
2018-05-22 https://doi.org/10.14419/ijet.v7i2.29.14288 -
Naval vessels, navy ship maintenance, operational availability, Downtime Influence Factors [DIFs], Delphi method. -
Abstract
Rapid development of shipbuilding and ship repair industry in recent years has been increasingly transforming the way organizations apply the long term strategic thinking of “cradle to grave†maintenance approach in order to maximize their growth in a dynamic marine industry. With increased ship complexity, size and revolutionary design, organizations strive to balance ideal maintenance philosophies against on-going efforts of cost reduction whilst maintaining high availability of vessels. Despite aspiration and efforts to improve the ship availability, the Royal Malaysian Navy [RMN] vessels which are currently maintained under the In Service Support [ISS] Contracts are hardly tackling the human and equipment related aspects due to limited knowledge and available data on ship Downtime Influence Factors [DIFs]. The current research carried out an explorative study across various engineering disciplines to generate RMN ship maintenance DIFs and their severity measures via a 3-Stage Modified Delphi approach. 30 Experts experienced in daily implementation of naval ship maintenance contracts were involved. In the first stage, Focus Group Discussions [FGDs] amongst Experts were conducted to produce the DIFs, followed by questionnaire distribution to measure the severity of the DIFs in the second stage. In the third stage, the Severe DIFs were confirmed and ranked based on a Risk Assessment method. The study revealed 50 DIFs to RMN ship availability and deduced the top 15 Severe DIFs pinpointing the key problem areas to prioritize efforts in improving RMN ship availability.
Â
Â
-
References
- style='mso-bidi-font-weight:normal'>
- style='mso-element:field-begin'>
- style='mso-spacerun:yes'> ADDIN EN.REFLIST
- normal'>[1] Al-Chalabi HS, Lundberg J, Wijaya A, Ghodrati B. Downtime analysis of drilling machines and suggestions for improvements. Journal of Quality in Maintenance Engineering. 2014;20[4]:306-32.
[2] SIA. The Collins Class: Submarine Institute of Australia. Available from: http://www.submarineinstitute.com/submarines-in-australia/the-Collins-Class.html.
[3] Ford G, McMahon C, Rowley C. Naval Surface Ship In-service Information Exploitation. In: Roy R, Tiwari A, Shaw A, Bell C, Phillips P, editors. Procedia CIRP, 2nd International Through-life Engineering Services Conference: Elsevier; 2013. p. 92-8.
[4] Dell'Isola A, Vendittelli A. Operational availability [Ao] of warships: A complex problem from concept to in service phase. 2015 IEEE Metrology for Aerospace [MetroAeroSpace]. 2015:26-32.
[5] GAO. Factors Limiting The Availability Of F-15 Aircraft At The 1st Tactical Fighter Wing. US General Accounting Office [GAO]; 1982.
[6] Blanchard BS, Fabrycky WJ. Systems Engineering and Analysis. 3rd Edition ed: Prentice Hall; 1998.
[7] Inozu B. Reliability, Availability and Maintainability [RAM] Database of Ship Operations Cooperative Program. PN 1996 Research Project No. 95-18.
[8] Na H, Yi L, Wang Y-G, Liu J-j, Bo Z, Lv X-Z, editors. Research on the Mean Logistic Delay Time of the Development Phrass. Physics Procedia - International Conference on Medical Physics and Biomedical Engineering [ICMPBE2012]; 2012: Elsevier B.V.
[9] GAO. Navy Force Structure: Sustainable Plan and Comprehensive Assessment Needed to Mitigate Long-Term Risks to Ships Assigned to Overseas Homeports. US Government Accountability Office [GAO]; 2015.
[10] Tomkins C. Transforming Warship Support: Class Output Management. RUSI Defence Systems. 2012;15, No.2[Autumn/Winter 2012].
[11] Henry R, Bil C, editors. Sustainment Management in the Royal Australian Navy. Transdisciplinary Lifecycle Analysis of Systems - Proceedings of the 22nd ISPE Inc International Conference on Concurrent Engineering; 2015 20-23 July: IOS Press.
[12] Hussin H, Hashim FM. Modeling of Maintenance Downtime Distribution using Expert Opinion. Journal of Applied Sciences. 2011;11[9]:1573-9.
[13] Goossens LHJ, Cooke RM, Halea AR, Rodić-Wiersma L. Fifteen years of expert judgement at TUDelft. Safety Science. 2008;46[2]:234-44.
[14] Franklin KK, Hart JK. Idea Generation and Exploration: Benefits and Limitations of the Policy Delphi Research Method. Innovative Higher Education 2007;31[4]:237–46.
[15] Pahl G, Beitz W, Feldhusen J, Grote K-H. Engineering Design: A systematic approach. edition r, editor: Springer; 2007.
[16] Reimann J, Kacprzynski G, Cabral D, Marini R. Using Condition Based Maintenance to Improve the Profitability of Performance Based Logistic Contracts Annual Conference of the Prognostics and Health Management Society2009.
[17] Rosenberger M, Pointner F. High availability: definition, influencing factors and solutions. Signal + Draht 2015:32-7.
[18] Bhagwan R, Tati K, Cheng Y-C, Voelker GM, editors. Total recall: system support for automated availability management. NSDI'04 Proceedings of the 1st conference on Symposium on Networked Systems Design and Implementation; 2004 March 29 - 31; San Francisco, California.
[19] Keating EG. Contracting for Weapon System Repair: An Examination of Alternative Approaches. RAND CORPORATION. 1996.
[20] Pan E, Liao W, Xi L. A single machine-based scheduling optimisation model integrated with preventive maintenance policy for maximizing the availabilty. International Journal of Industrial and Systems Engineering. 2012;10[4].
[21] GAO. Navy Air Launched Missiles-Increased Availability Through Improved Inspection and Maintenance Scheduling Practices. US Government Accountability Office [GAO]; 1981.
[22] Badiru D. Getting Things Done Through Project Management: iUniverse; 2009.
[23] Wilson R. A Comprehensive Guide to Project Management Schedule and Cost Control: Methods and Models for Managing the Project Lifecycle. 1st Edition ed: Pearson FT Press; 2014 April 19, 2014.
[24] Bradley SR, Hayter CS, Link AN. Models and Methods of University Technology Transfer. Greensboro: University of North Carolina; 2013.
[25] Jazouli T, Sandborn P. Using PHM to meet availability-based contracting requirements. IEEE Conference on Prognostics and Health Management; Montreal2011. p. 1-12.
[26] Jazouli T, Sandborn P. A Design for Availability Approach for Use with PHM. Annual Conference of the Prognostics and Health Management Society2010.
[27] Canada DoMS. LEADMARK: The Navy's Strategy for 2020. Ottawa, Ontario: Art Direction by DGPA Creative Services; 2001.
[28] Marais KB, Rivas J, Tetzloff IJ, Crossley WA. Modeling the impact of maintenance on naval fleet total ownership cost. Systems Conference [SysCon], 2013 IEEE International; Orlando, FL2013. p. 801-8.
[29] RMN. RMN Patrol Vessel - In-Service Support Contract. Royal Malaysian Navy [RMN]; 2011.
[30] Paik S. A Study on the Case Study and Evaluation Methodology of Operational Availability for a Naval Ship using OT&E Data. Journal of the KIMST. 2014;17:471-8.
[31] Record C. Tribute to Admiral Frank "Skip" Bowman. U S Congress; 2004. p. 23469.
[32] Stambaugh K, Barry C. Naval Ship Structure Service Life Considerations. Naval Engineers Journal. 2014;126[3]:103-17.
[33] Peiravi A. Redundancy and Reliability of Air to Air Missile Fuze Electronics Journal of American Science. 2010;6[2]:147-54.
[34] Dell'Isola A, Vendittelli A. The Life Cycle Cost [LCC] Tree. Operational availability [Ao] of warships: A complex problem from concept to in service phase: IEEE Metrology for Aerospace [MetroAeroSpace]; 2015. p. The Life Cycle Cost [LCC] Tree.
[35] Parida A, Kumar U. Handbook of Maintenance Management and Engineering: Maintenance Productivity and Performance Measurement XXVII ed: Springer; 2009.
[36] Kelly A. Maintenance Organization and Systems: Butterworth-Heinemann; 1997.
[37] Pecht M. Product Reliability, Maintainability, and Supportability Handbook. Second Edition ed: CRC Press; 2009.
[38] Neely A, Benedetinni O, Visnjic I. The Servitization of Manufacturing: Further Evidence. 18th European Operations Management Association Conference; July Cambridge2011.
[39] Jin T, Xiang Y, Cassady R, editors. Understanding operational availability in performance-based logistics and maintenance services. Reliability and Maintainability Symposium [RAMS], 2013 Proceedings - Annual; 2013 28-31 Jan. 2013; Orlando, FL, USA: IEEE.
[40] Dattaa PP, Rajkumar Royb. Cost modelling techniques for availability type service support contracts: A literature review and empirical study. CIRP Journal of Manufacturing Science and Technology. 2010;3[2]:142-57.
[41] Bateson JT. In-Circuit Testing: Springer Netherlands; 1985.
[42] U.S. Congress OoTA. The Social Security Administration and Information Technology-Special Report. [Washington, DC: U.S. Government Printing Office, 1986 NTIS order #PB87-136834.
[43] GAO. AVIATION WORKFORCE: Current and Future Availability of Aviation Engineering and Maintenance Professionals. U.S. Government Accountability Office [GAO]; 2014.
[44] Skulmoski GJ, Hartman FT, Krahn J. The Delphi Method for Graduate Research Journal of Information Technology Education. 2007;6.
[45] Adler M, Ziglio E. Gazing into the Oracle - The Delphi Method and its Application to Social Policy and Public Health: Jessica Kingsley Publishers; 1996.
[46] Czinkota MR, Ronkainen IA. International Business and Trade in the Next Decade: Report from a Delphi Study. Journal of International Business Studies. 1997;28[4]:827-44.
[47] Linstone HA, Turoff M. The Delphi Method: Techniques and Applications2002.
[48] Cuhls K. Delphi Method2002/2003:[95 p.].
[49] Grisham T. The Delphi technique: a method for testing complex and multifaceted topics. International Journal of Managing Projects in Business. 2009;2[1]:112-30.
[50] Márquez AC. The Maintenance Management Framework: Models and Methods for Complex Systems Maintenance: Springer; 2007.
[51] Rieger WG. Directions in Delphi developments: dissertations and their quality. Technological Forecasting and Social Change. 1986;29:195-204.
[52] Yousuf MI. Using Experts’ Opinions Through Delphi Technique. Practical Assessment, Research & Evaluation. 2007;12.
[53] Hsu C-C, Sandford BA. The Delphi Technique: Making Sense Of Consensus. Practical Assessment, Research & Evaluation. 2007;12.
[54] Delbecq AL, Ven AHVD, Gustafson DH. Group Techniques for Program Planning: A Guide to Nominal Group and Delphi Processes. 1st edition ed: Green Briar Press; 1975.
[55] Cyphert FR, Gant WL. The Delphi technique: A case study. 1971;52:272-3.
[56] Brooks KW. Delphi technique: expanding applications. North Central Association Quarterly. 1979;54:377-85.
[57] Ludwig B. Predicting the Future: Have you considered using the Delphi Methodology? Tools of the Trade 5TOT2. 1997;35, No.5.
[58] Custer RL, Scarcella JA, Stewart BR. The Modified Delphi Technique - A Rotational Modification. Journal of Career and Technical Education. 1999;15[2].
[59] Riggs WE. The Delphi Technique: An Experimental Evaluation. Technological Forecasting and Social Change. 1983;23:89-94.
[60] Rowe G, Wright G. The Delphi technique: Past, present, and future prospects - Introduction to the special issue. Technological Forecasting & Social Change. 2011;78:1487-90.
[61] Baker SE, Edwards R. How many qualitative interviews is enough? Expert voices and early career reflections on sampling and cases in qualitative research 2012.
[62] Adler PA, Adler P. The Tender Cut: Inside the Hidden World of Self-Injury 2nd edition ed: NYU Press; 2011 August 22.
[63] Ristic D. A tool for risk assessment Journal Safety Engineering. 2013;UDC 512.64:614.026.1,:121-7.
[64] Ayyub BM. Methods for Expert-Opinion Elicitation of Probabilties and Consequences for Corps Facilities. U.S. Army Corps of Engineers, Institute for Water Resources, 2000 December. Report No.: IWR Rport -00-R-10.
[65] Shah HA, Kalaian SA. Which Is the Best Parametric Statistical Method For Analyzing Delphi Data? Journal of Modern Applied Statistical Methods 2009;8[1]:Article 20.
[66] Dajani JS, Sincoff MZ, Talley WK. Stability and agreement criteria for the termination of Delphi studies. Technological Forecasting and Social Change. 1979;13:83-90.
- mso-fareast-font-family:Batang;mso-ansi-language:EN-US;mso-fareast-language:
- KO;mso-bidi-language:AR-SA'>
-
Downloads
-
How to Cite
Bin Abdul Wahid, A.-S., Zamani Bin Ahmad, M., ., S., Najib Bin Abdul Ghani Yolhamid, M., Abu Ubaidah Amir Abu Zarim, M., Binti Abdullah, A., & Hanani Bt Ahmad Azlan, N. (2018). Measuring Severity of Downtime Influence Factors to Naval Ship Operational Availability: A Delphi Study. International Journal of Engineering & Technology, 7(2.29), 940-946. https://doi.org/10.14419/ijet.v7i2.29.14288Received date: 2018-06-18
Accepted date: 2018-06-18
Published date: 2018-05-22