The Potential Role of Value Management in Construction Industry Using Primavera

  • Authors

    • T Subramani
    • Joe Cherian
    2018-07-15
    https://doi.org/10.14419/ijet.v7i3.10.15620
  • Potential, Role, Value, Management, Construction, Industry and Primavera.
  • Abstract

    EVM (Earned value management) is a undertaking management tool that uses records primarily based on value, agenda and work performance to outline the modern fame of the project. This facilitates the supervisor to extrapolate current developments to predict their probably very last impact. this approach is proved effective in fee manage. the primavera is project management software program which enables customers to track and analyze performance of task. The document wizard in primavera creates custom designed reviews that extract precise records from its database. The paper outlines the fundamental principles of the EVM & how it could be used effectively for unique challenge with assist of primavera. Additionally a few advantages and headaches of EVM as regards  to Indian creation area. Many construction tasks be afflicted by time and value overruns because of a multiplicity of things. This technique allows everything in evaluation of all budgeted value of work to real value. The existing have a look at deals with the scheduling and venture tracking manner alongside it also discusses principal parameter’s involving in the calculation of earned cost analysis in fee and time control of civil construction project. Using an example of real time venture, methodologies and analysis are demonstrated in this paper.    

      

     


  • References

    1. [1]. T.Subramani., â€Cost Estimation and Identification of Transport Infrastructure facility Projects in Salemâ€, International Journal of Engineering and Technology, Vol.2, No.5, Pp 859 – 867,2012.

      [2]. T.Subramani., P.Anitha., S.Sekar., “Health-Care Waste Management Systemâ€, International Journal of Engineering Research and Applications, Vol. 4, Issue 6( Version 2), pp.255-258, 2014.

      [3]. T.Subramani., N.Kanthasamy., “High End Solution For Advanced Civil Engineering Projectsâ€, International Journal of Modern Engineering Research, Volume. 4, Issue. 6 (Version 3), pp 49-53, 2014.

      [4]. T.Subramani.,D.S.StephanJabasingh,J.Jayalakshmi. “Analysis Of Cost Controlling In Construction Industries By Earned Value Method Using Primaveraâ€, International Journal of Engineering Research and Applications, Volume. 4, Issue. 6 (Version 5), pp 145 -153, 2014.

      [5]. T.Subramani.T, P.T. Lishitha., M.Kavitha., “Time Overrun And Cost Effectiveness In The Construction Industryâ€, International Journal of Engineering Research and Applications, Volume. 4, Issue. 6 (Version 5), pp 111- 116, 2014.

      [6]. T.Subramani. , R.Lordsonmillar., “Safety Management Analysis In Construction Industryâ€, International Journal of Engineering Research and Applications, Volume. 4, Issue. 6 (Version 5), pp 117- 120, 2014.

      [7]. T.Subramani., A.Sarkunam.A, J.Jayalakshmi. “Planning And Scheduling Of High Rise Building Using Primavera†, International Journal of Engineering Research and Applications, Volume. 4, Issue. 6 (Version 5), pp 134 - 144, 2014.

      [8]. T.Subramani.,P.S.Sruthi., M.Kavitha. “Causes Of Cost Overrun In Constructionâ€, IOSR Journal of Engineering, Volume. 4, Issue. 6 (Version 3), pp 1 - 7, 2014

      [9]. T.Subramani, M.Sekar , " Preplanning And Scheduling Of Road Construction By Using PPM" , International Journal of Application or Innovation in Engineering & Management (IJAIEM) , Volume 4, Issue 5, pp. 234-244 , 2015

      [10]. T.Subramani, V.Jayaraman , " Analysis Of Construction Workers Migrate From Industries" , International Journal of Application or Innovation in Engineering & Management (IJAIEM) , Volume 4, Issue 5, pp. 274-283 , 2015

      [11]. T.Subramani, S.Tamizhanban , " Supply Chain Management In Construction Site By Using SPSS Software" , International Journal of Emerging Trends & Technology in Computer Science (IJETTCS) , Volume 5, Issue 3, pp. 182-193 , 2016.

      [12]. T.Subramani, S.R.Rajiv , " Improving Construction Efficiency And Productivity Of Industry Using SPSS" , International Journal of Application or Innovation in Engineering & Management (IJAIEM) , Volume 5, Issue 5, pp. 239-250 , 2016 .

      [13]. T.Subramani, K.Chinnadurai , " Construction Management And Scheduling Of Residential Building Using Primavera" International Journal of Application or Innovation in Engineering & Management (IJAIEM) , Volume 4, Issue 5, pp. 188-198 , 2015

      [14]. T.Subramani, Kurian Jacob , " Analysis Of Risk, Threshold And Issues And Monitoring Schedule Of Building Construction Using PPM Software" , International Journal of Emerging Trends & Technology in Computer Science (IJETTCS) , Volume 5, Issue 3, pp. 171-181 , 2016.

      [15]. T.Subramani, M. Muhammed Ansar, S.Priyanka , " Impact Of Prefabricated Technology And Equipment On The Profitability Using Primavera " , International Journal of Emerging Trends & Technology in Computer Science (IJETTCS), Volume 6, Issue 3, May - June 2017 , pp. 176-185 , ISSN 2278-6856.

      [16]. T.Subramani, V.Annamalai , S.Priyanka , " Management Information And Communication Technology In Construction Engineering Of Structures Using Primavera " , International Journal of Emerging Trends & Technology in Computer Science (IJETTCS), Volume 6, Issue 3, May - June 2017 , pp. 186-197 , ISSN 2278-6856.

      [17]. T.Subramani, V.Bhaskaran Nair, A.David, B.Mohamed Ghouse, N.Siva Kumar , " A Study Of Inventory Management System In Construction Industry " , International Journal of Application or Innovation in Engineering & Management (IJAIEM), Volume 6, Issue 5, May 2017 , pp. 304-311 , ISSN 2319 - 4847.

  • Downloads

  • How to Cite

    Subramani, T., & Cherian, J. (2018). The Potential Role of Value Management in Construction Industry Using Primavera. International Journal of Engineering & Technology, 7(3.10), 14-17. https://doi.org/10.14419/ijet.v7i3.10.15620

    Received date: 2018-07-14

    Accepted date: 2018-07-14

    Published date: 2018-07-15