Study on Time and Resource Management in Construction Projects Using MS Project

  • Authors

    • T Subramani
    • T M.Karthick
    2018-07-15
    https://doi.org/10.14419/ijet.v7i3.10.15622
  • Time, Resource, Management, Construction and MS Project.
  • This construction project study about excessive stake endeavor aiming at time certain programmed performance goal. Except combine resources are deliberate and procured, no activity may be completed in line with a pre fixed time table. Project managers ought to take complicated choices under exceptional scheduling desires and below situations of uncertainty that every so often expand past assignment intervals. Our project study  offers with useful resource scheduling for a quick track project with constrained intervals. The learning has been executed in stages. Inside the first segment, with the useful resource of MS PROJECT software task time table for numerous activities for the development of a business constructing become prepared. Finally, requirements of sources had been attributed to the activities primarily depend on Standard Schedule Rates. The considered necessary necessity information collected from the designated drawings and triumphing site online situations. The analysis was completed with the aid of useful resource leveling for diverse activities by way of reducing resources with accelerated length to observe the time-cost implications.

  • References

    1. [1]. T.Subramani., â€Cost Estimation and Identification of Transport Infrastructure facility Projects in Salemâ€, International Journal of Engineering and Technology, Vol.2, No.5, Pp 859 – 867,2012.

      [2]. T.Subramani., P.Anitha., S.Sekar., “Health-Care Waste Management Systemâ€, International Journal of Engineering Research and Applications, Vol. 4, Issue 6( Version 2), pp.255-258, 2014.

      [3]. T.Subramani., N.Kanthasamy., “High End Solution For Advanced Civil Engineering Projectsâ€, International Journal of Modern Engineering Research, Volume. 4, Issue. 6 (Version 3), pp 49-53, 2014.

      [4]. T.Subramani.,D.S.StephanJabasingh,J.Jayalakshmi. “Analysis Of Cost Controlling In Construction Industries By Earned Value Method Using Primaveraâ€, International Journal of Engineering Research and Applications, Volume. 4, Issue. 6 (Version 5), pp 145 -153, 2014.

      [5]. T.Subramani.T, P.T. Lishitha., M.Kavitha., “Time Overrun And Cost Effectiveness In The Construction Industryâ€, International Journal of Engineering Research and Applications, Volume. 4, Issue. 6 (Version 5), pp 111- 116, 2014.

      [6]. T.Subramani. , R.Lordsonmillar., “Safety Management Analysis In Construction Industryâ€, International Journal of Engineering Research and Applications, Volume. 4, Issue. 6 (Version 5), pp 117- 120, 2014.

      [7]. T.Subramani., A.Sarkunam.A, J.Jayalakshmi. “Planning And Scheduling Of High Rise Building Using Primavera†, International Journal of Engineering Research and Applications, Volume. 4, Issue. 6 (Version 5), pp 134 - 144, 2014.

      [8]. T.Subramani.,P.S.Sruthi., M.Kavitha. “Causes Of Cost Overrun In Constructionâ€, IOSR Journal of Engineering, Volume. 4, Issue. 6 (Version 3), pp 1 - 7, 2014

      [9]. T.Subramani, M.Sekar , " Preplanning And Scheduling Of Road Construction By Using PPM" , International Journal of Application or Innovation in Engineering & Management (IJAIEM) , Volume 4, Issue 5, pp. 234-244 , 2015

      [10]. T.Subramani, V.Jayaraman , " Analysis Of Construction Workers Migrate Froxm Industries" , International Journal of Application or Innovation in Engineering & Management (IJAIEM) , Volume 4, Issue 5, pp. 274-283 , 2015

      [11]. T.Subramani, S.Tamizhanban , " Supply Chain Management In Construction Site By Using SPSS Software" , International Journal of Emerging Trends & Technology in Computer Science (IJETTCS) , Volume 5, Issue 3, pp. 182-193 , 2016.

      [12]. T.Subramani, S.R.Rajiv , " Improving Construction Efficiency And Productivity Of Industry Using SPSS" , International Journal of Application or Innovation in Engineering & Management (IJAIEM) , Volume 5, Issue 5, pp. 239-250 , 2016 .

      [13]. T.Subramani, K.Chinnadurai , " Construction Management And Scheduling Of Residential Building Using Primavera" International Journal of Application or Innovation in Engineering & Management (IJAIEM) , Volume 4, Issue 5, pp. 188-198 , 2015

      [14]. T.Subramani, Kurian Jacob , " Analysis Of Risk, Threshold And Issues And Monitoring Schedule Of Building Construction Using PPM Software" , International Journal of Emerging Trends & Technology in Computer Science (IJETTCS) , Volume 5, Issue 3, pp. 171-181 , 2016.

      [15]. T.Subramani, M. Muhammed Ansar, S.Priyanka , " Impact Of Prefabricated Technology And Equipment On The Profitability Using Primavera " , International Journal of Emerging Trends & Technology in Computer Science (IJETTCS), Volume 6, Issue 3, May - June 2017 , pp. 176-185 , ISSN 2278-6856.

      [16]. T.Subramani, V.Annamalai , S.Priyanka , " Management Information And Communication Technology In Construction Engineering Of Structures Using Primavera " , International Journal of Emerging Trends & Technology in Computer Science (IJETTCS), Volume 6, Issue 3, May - June 2017 , pp. 186-197 , ISSN 2278-6856.

      [17]. T.Subramani, V.Bhaskaran Nair, A.David, B.Mohamed Ghouse, N.Siva Kumar , " A Study Of Inventory Management System In Construction Industry " , International Journal of Application or Innovation in Engineering & Management (IJAIEM), Volume 6, Issue 5, May 2017 , pp. 304-311 , ISSN 2319 - 4847.

  • Downloads

  • How to Cite

    Subramani, T., & M.Karthick, T. (2018). Study on Time and Resource Management in Construction Projects Using MS Project. International Journal of Engineering & Technology, 7(3.10), 23-26. https://doi.org/10.14419/ijet.v7i3.10.15622