Analyzing Inventory Material Management Control Techniques on Residential Construction Project Using SPSS

  • Authors

    • T Subramani
    • T Suresh Kumar
    2018-07-15
    https://doi.org/10.14419/ijet.v7i3.10.15625
  • Analyzing, Inventory, Control Techniques, Project and SPSS.
  • Building Construction materials adopted 50% of cost from the total estimation of the project. Estimated Cost and planned schedule can be achieved by effective material management. The project team must be understood the goals and efficient material management techniques for successful project execution. A well planned material management possible by on time delivery and equipment to the job site and improved workforce planning increased labor productivity, planned schedules and minimum cost. Questionnaire were prepared for data analysis based on Likert’s scale 25 respondents were answered the questionnaire. Collected data analyzed using SPSS.To reveal the respondents responses for enhance the analysis results used there are Frequency analysis, Factor analysis, and reliability analysis. Results will be obtained and also recommendations will be suggested.

     

     

     

  • References

    1. [1] T.Subramani., â€Cost Estimation and Identification of Transport Infrastructure facility Projects in Salemâ€, International Journal of Engineering and Technology, Vol.2, No.5, Pp 859 – 867,2012.

      [2] T.Subramani., P.Anitha., S.Sekar., “Health-Care Waste Management Systemâ€, International Journal of Engineering Research and Applications, Vol. 4, Issue 6( Version 2), pp.255-258, 2014.

      [3] T.Subramani., N.Kanthasamy., “High End Solution For Advanced Civil Engineering Projectsâ€, International Journal of Modern Engineering Research, Volume. 4, Issue. 6 (Version 3), pp 49-53, 2014.

      [4] T.Subramani.,D.S.StephanJabasingh,J.Jayalakshmi. “Analysis Of Cost Controlling In Construction Industries By Earned Value Method Using Primaveraâ€, International Journal of Engineering Research and Applications, Volume. 4, Issue. 6 (Version 5), pp 145 -153, 2014.

      [5] T.Subramani.T, P.T. Lishitha., M.Kavitha., “Time Overrun And Cost Effectiveness In The Construction Industryâ€, International Journal of Engineering Research and Applications, Volume. 4, Issue. 6 (Version 5), pp 111- 116, 2014.

      [6] T.Subramani. , R.Lordsonmillar., “Safety Management Analysis In Construction Industryâ€, International Journal of Engineering Research and Applications, Volume. 4, Issue. 6 (Version 5), pp 117- 120, 2014.

      [7] T.Subramani., A.Sarkunam.A, J.Jayalakshmi. “Planning And Scheduling Of High Rise Building Using Primavera†, International Journal of Engineering Research and Applications, Volume. 4, Issue. 6 (Version 5), pp 134 - 144, 2014.

      [8] T.Subramani.,P.S.Sruthi., M.Kavitha. “Causes Of Cost Overrun In Constructionâ€, IOSR Journal of Engineering, Volume. 4, Issue. 6 (Version 3), pp 1 - 7, 2014

      [9] T.Subramani, M.Sekar , " Preplanning And Scheduling Of Road Construction By Using PPM" , International Journal of Application or Innovation in Engineering & Management (IJAIEM) , Volume 4, Issue 5, pp. 234-244 , 2015

      [10] T.Subramani, V.Jayaraman , " Analysis Of Construction Workers Migrate From Industries" , International Journal of Application or Innovation in Engineering & Management (IJAIEM) , Volume 4, Issue 5, pp. 274-283 , 2015

      [11] T.Subramani, S.Tamizhanban , " Supply Chain Management In Construction Site By Using SPSS Software" , International Journal of Emerging Trends & Technology in Computer Science (IJETTCS) , Volume 5, Issue 3, pp. 182-193 , 2016.

      [12] T.Subramani, S.R.Rajiv , " Improving Construction Efficiency And Productivity Of Industry Using SPSS" , International Journal of Application or Innovation in Engineering & Management (IJAIEM) , Volume 5, Issue 5, pp. 239-250 , 2016 .

      [13] T.Subramani, K.Chinnadurai , " Construction Management And Scheduling Of Residential Building Using Primavera" International Journal of Application or Innovation in Engineering & Management (IJAIEM) , Volume 4, Issue 5, pp. 188-198 , 2015

      [14] T.Subramani, Kurian Jacob , " Analysis Of Risk, Threshold And Issues And Monitoring Schedule Of Building Construction Using PPM Software" , International Journal of Emerging Trends & Technology in Computer Science (IJETTCS) , Volume 5, Issue 3, pp. 171-181 , 2016.

      [15] T.Subramani, M. Muhammed Ansar, S.Priyanka , " Impact Of Prefabricated Technology And Equipment On The Profitability Using Primavera " , International Journal of Emerging Trends & Technology in Computer Science (IJETTCS), Volume 6, Issue 3, May - June 2017 , pp. 176-185 , ISSN 2278-6856.

      [16] T.Subramani, V.Annamalai , S.Priyanka , " Management Information And Communication Technology In Construction Engineering Of Structures Using Primavera " , International Journal of Emerging Trends & Technology in Computer Science (IJETTCS), Volume 6, Issue 3, May - June 2017 , pp. 186-197 , ISSN 2278-6856.

      [17] T.Subramani, V.Bhaskaran Nair, A.David, B.Mohamed Ghouse, N.Siva Kumar , " A Study Of Inventory Management System In Construction Industry " , International Journal of Application or Innovation in Engineering & Management (IJAIEM), Volume 6, Issue 5, May 2017 , pp. 304-311 , ISSN 2319 - 4847.

  • Downloads

  • How to Cite

    Subramani, T., & Suresh Kumar, T. (2018). Analyzing Inventory Material Management Control Techniques on Residential Construction Project Using SPSS. International Journal of Engineering & Technology, 7(3.10), 36-39. https://doi.org/10.14419/ijet.v7i3.10.15625