Analysis Cost Overruns, Delays and Risk Involved in Construction Management Using Primavera

  • Authors

    • T Subramani
    • P Sivakumar
    2018-07-15
    https://doi.org/10.14419/ijet.v7i3.10.15651
  • Analysis, Cost overruns, Delays, Risk and Primavera
  • Construction industry is taken into consideration as one of the maximum crucial industries in India. These phenomena may additionally have an effect on the development of construction industry in India. In addition to may additionally expose many establishments of construction to be destroyed. Delays in addition to disruptions are sources of capacity risks that studies are looking into techniques to manipulate along with technical, social, monetary, felony, economic, useful resource, creation and commercial. To evaluate the reasons of delays and conflicts are due to: layout modifications, delays in price to contractors, facts delays, investment troubles, bad challenge management, compensation problems and disagreement at the valuation of labor accomplished. On the other hand, time overrun, cost overrun, bad social effect, idling assets and disputes are the principle outcomes of delays and disruptions. The observe concludes the reasons of delays and disruptions and their outcomes placed construction projects at extremely great risk that have an impact on their performance the use of primavera.

     

  • References

    1. [1]. T.Subramani., â€Cost Estimation and Identification of Transport Infrastructure facility Projects in Salemâ€, International Journal of Engineering and Technology, Vol.2, No.5, Pp 859 – 867,2012.

      [2]. T.Subramani., P.Anitha., S.Sekar., “Health-Care Waste Management Systemâ€, International Journal of Engineering Research and Applications, Vol. 4, Issue 6( Version 2), pp.255-258, 2014.

      [3]. T.Subramani., N.Kanthasamy., “High End Solution For Advanced Civil Engineering Projectsâ€, International Journal of Modern Engineering Research, Volume. 4, Issue. 6 (Version 3), pp 49-53, 2014.

      [4]. T.Subramani.,D.S.StephanJabasingh,J.Jayalakshmi. “Analysis Of Cost Controlling In Construction Industries By Earned Value Method Using Primaveraâ€, International Journal of Engineering Research and Applications, Volume. 4, Issue. 6 (Version 5), pp 145 -153, 2014.

      [5]. T.Subramani.T, P.T. Lishitha., M.Kavitha., “Time Overrun And Cost Effectiveness In The Construction Industryâ€, International Journal of Engineering Research and Applications, Volume. 4, Issue. 6 (Version 5), pp 111- 116, 2014.

      [6]. T.Subramani. , R.Lordsonmillar., “Safety Management Analysis In Construction Industryâ€, International Journal of Engineering Research and Applications, Volume. 4, Issue. 6 (Version 5), pp 117- 120, 2014.

      [7]. T.Subramani., A.Sarkunam.A, J.Jayalakshmi. “Planning And Scheduling Of High Rise Building Using Primavera†, International Journal of Engineering Research and Applications, Volume. 4, Issue. 6 (Version 5), pp 134 - 144, 2014.

      [8]. T.Subramani.,P.S.Sruthi., M.Kavitha. “Causes Of Cost Overrun In Constructionâ€, IOSR Journal of Engineering, Volume. 4, Issue. 6 (Version 3), pp 1 - 7, 2014

      [9]. T.Subramani, M.Sekar , " Preplanning And Scheduling Of Road Construction By Using PPM" , International Journal of Application or Innovation in Engineering & Management (IJAIEM) , Volume 4, Issue 5, pp. 234-244 , 2015

      [10]. T.Subramani, V.Jayaraman , " Analysis Of Construction Workers Migrate From Industries" , International Journal of Application or Innovation in Engineering & Management (IJAIEM) , Volume 4, Issue 5, pp. 274-283 , 2015

      [11]. T.Subramani, S.Tamizhanban , " Supply Chain Management In Construction Site By Using SPSS Software" , International Journal of Emerging Trends & Technology in Computer Science (IJETTCS) , Volume 5, Issue 3, pp. 182-193 , 2016.

      [12]. T.Subramani, S.R.Rajiv , " Improving Construction Efficiency And Productivity Of Industry Using SPSS" , International Journal of Application or Innovation in Engineering & Management (IJAIEM) , Volume 5, Issue 5, pp. 239-250 , 2016 .

      [13]. T.Subramani, K.Chinnadurai , " Construction Management And Scheduling Of Residential Building Using Primavera" International Journal of Application or Innovation in Engineering & Management (IJAIEM) , Volume 4, Issue 5, pp. 188-198 , 2015

      [14]. T.Subramani, Kurian Jacob , " Analysis Of Risk, Threshold And Issues And Monitoring Schedule Of Building Construction Using PPM Software" , International Journal of Emerging Trends & Technology in Computer Science (IJETTCS) , Volume 5, Issue 3, pp. 171-181 , 2016.

      [15]. T.Subramani, M. Muhammed Ansar, S.Priyanka , " Impact Of Prefabricated Technology And Equipment On The Profitability Using Primavera " , International Journal of Emerging Trends & Technology in Computer Science (IJETTCS), Volume 6, Issue 3, May - June 2017 , pp. 176-185 , ISSN 2278-6856.

      [16]. T.Subramani, V.Annamalai , S.Priyanka , " Management Information And Communication Technology In Construction Engineering Of Structures Using Primavera " , International Journal of Emerging Trends & Technology in Computer Science (IJETTCS), Volume 6, Issue 3, May - June 2017 , pp. 186-197 , ISSN 2278-6856.

      [17]. T.Subramani, V.Bhaskaran Nair, A.David, B.Mohamed Ghouse, N.Siva Kumar , " A Study Of Inventory Management System In Construction Industry " , International Journal of Application or Innovation in Engineering & Management (IJAIEM), Volume 6, Issue 5, May 2017 , pp. 304-311 , ISSN 2319 - 4847.

  • Downloads

  • How to Cite

    Subramani, T., & Sivakumar, P. (2018). Analysis Cost Overruns, Delays and Risk Involved in Construction Management Using Primavera. International Journal of Engineering & Technology, 7(3.10), 160-163. https://doi.org/10.14419/ijet.v7i3.10.15651