Post Project Assessment of Risk in Construction Projects
-
2018-07-20 https://doi.org/10.14419/ijet.v7i3.12.15916 -
Risk management, Ranking of factors, Risk identification. -
Abstract
In these days construction projects are applied in risky and unstable environments results in a very high risk factors and unreliability. Risk assessment is a way to conclude the risks and quandary of the project executed and directs it with some actual solutions. In this field the top managements authority need to detect the value, phase, grade and status of the project. Since there is lot of different problems are intricate in construction and it is so hard to keep in existence of value, phase, grade and status as schedule. This paper recognizes the factors required in the projects of construction field and to predict the possibilities which are affects the construction and reduction calculations. The probable risk factors available in the post project and it is categorized the very little effects to huge effects has been composed by the questionnaire survey. And the outcomes were look over by the SPSS software. The acceptable guidance was afforded to make over the negative issues.
Â
Â
-
References
[1] Dikmen , M.T. Birgonul , C. Anac , J.H.M. Tah , G. Aouad “A tool for post-project risk assessment†Elsevier Vol 18 (2018) Pg 42-50
[2] Ahmet Ozats , Onder Okmen “Judgmental risk analysis process development in construction projects†Elsevier Vol 40 (2005) Pg 1244-1254
[3] Osama Ahmed Jannadi , Salaman Almishari “Risk Assessment in Constructions†American Society of Civil Engineering Vol 10.10 (2003) Pg 492
[4] Daud Nasir, Brenda McCabe, Loesie Hartono “Evaluating Risk in Construction-Schedule Model Construction Schedule Risk model†American Society of Civil Engineering Vol 10.1061 (2003) Pg 518
[5] B.Mulholland , J.Christan “Risk Assessment in Construction Schedules†Journal of Construction Engineering And Management Vol 125 (1999) Pg 8-15
[6] Edward, J.Jaselskis “Risk Analysis Approach To Selection Of Contractor Evaluation Method†Journal of Construction Engineering And Management Vol 118 (1992) Pg 814-821
[7] Shou Qing Wang, Robert L.K Tiong “Analysis of Key Contract Clauses in China BOT Project†Journal of Construction Engineering And Management Vol 191 (1999).
-
Downloads
-
How to Cite
Naveen, N., Harshit, N., Muthu, D., Venkatasubramaniam, C., & Sharmila, P. (2018). Post Project Assessment of Risk in Construction Projects. International Journal of Engineering & Technology, 7(3.12), 185-187. https://doi.org/10.14419/ijet.v7i3.12.15916Received date: 2018-07-20
Accepted date: 2018-07-20
Published date: 2018-07-20