The choice of district road construction by the method of analytical hierarchy process and simple multi attribute rating technique

  • Authors

    • Nunung Widyaningsih Mercubuana University
    • Bambang Purwoko Kusumo Bintoro
    • Bambang Purwoko Kusumo Bintoro
    • Rahmat Hidayat Renggah
    • Rahmat Hidayat Renggah
    2018-09-16
    https://doi.org/10.14419/ijet.v7i4.16276
  • Durability, Maintanance, Analytic Hierarchy Process and Simple Multi Attribute Rating Technique.
  • The choice of country road construction applying the method of Analytic Hierarchy Process and Simple Multi Attribute Rating Technique for the aim of the formulation and decision-making for the choice of road construction between flexible pavement and rigid pavement. The case study takes a road in the area of Poso, Center of Sulawesi, Indonesia. Data is taken by using a detailed questionnaire and distributed to respondents at random by 30 people. From the analysis of the obtained results are as follows as the selection of the path using the method of Analytic Hierarchy Process by weighting variables long-term durability and maintenance, the Simple Multi Attribute Rating Technique method by trading and cost benefit. Based on long-term durability, road construction should be resistant to weather is the first priority, and to resistant of traffic density and the road construction must be impervious to the ground shifting. Based on maintenance. The first priority is the path should be a period of excellent treatment and ease implemented of construction. Road construction to be used based on Analytic Hierarchy Process and Simple Multi Attribute Rating Technique is the flexible pavement. The weighting of the results seen from long-term durability and maintenance are obtained that the road asphalt has the highest weight value is 61.4% while the concrete path is 38.6%. The cost of the flexible pavement has a price of Rp. 365.788.000,-value benefit of/km is 61.40%, whereas for rigid path have a price amounting is Rp. 708.029.000,-value benefit of/km is 38.60%.

     

     

  • References

    1. [1] BPS. (2015), “Land Transportation Statistics’. Central Bureau of Statistics

      [2] N. Widyaningsih, (2003), “Lecturer Note: Statisticâ€. unpublished. Mercubuana University.

      [3] Chien, S. Tang, Y. Schonfeld, P. (2002), “Optimizing Work Zones for Two-Lane Highway Maintenance Projects†ASCE. J. Transp. Eng. 2002.128:145-155, pp. 10.

      [4] Darmawan. (2013), “Quantitative Research Methods. Teenagers†Rosdakarya. Bandung.

      [5] Flanagan, R. dan Norman, G. (1993), Risk Management and Construction. Cambridge. University Press.

      [6] Hajiyani, D. (2015), “Review Of Methods and Models for Economic Appraisal Ofhighway Project in Indiaâ€. Journal of International Academic Research For Multidisciplinary. ISSN: 2320-5083, Volume 3, Issue 4, May 2015, pp. 18.

      [7] Hardianto, A. (2015), “Analysis of Time Management and Cost of Hotel Development Project Management with Network CPM.†Thesis. Civil Engineering, Muhamadiyah Surakarta University, pp. 5.

      [8] Huntington, George and Ksaibati, Khaled. (2009),†Annualized Road Works Cost Estimates for Unpaved Roadsâ€. ASCE. J. Transp. Eng. 2009.135:702-710, pp. 2-3. https://doi.org/10.1061/(ASCE)TE.1943-5436.0000053.

      [9] Lei, Zhang. Xu-dong, Wang. Ling-yan, Shan. Guo-jun, Liu. (2014), “Evaluation of the Durability of Asphalt Concrete Anti-skid Performanceâ€. ASCE. J. Highway Transp. Res. Dev. (English Ed.), 2014, 8(3): 25-29, pp. 4-5.

      [10] Michael, Jean. (1992).†A method for preevaluation and selection of road projects adapted to the specific conditionsâ€. ASCE. J. Transp. Eng. 1992.118:160-178, pp. 18.

      [11] Partovi, F. Y., (1994), “Determining What to Bencmark: An Analytical Hierarchy Process Approachâ€. International Journal of Operations and Production Management, 14 (6), pp. 55 – 39. https://doi.org/10.1108/01443579410062068.

      [12] Regulation of the Minister of Public Works Nomor 13 (2011), “Procedures for Maintenance and Ownership of Roadsâ€. Jakarta, pp. 3.

      [13] Regulation of the Minister of Public Works Nomor 19 (2011) “Road Technical Requirements and Road Technical Planning Criteriaâ€. State of the Republic of Indonesia Year 2011 Number 900. Jakarta, pp. 19-20.

      [14] Saaty, T. L., (1990). Fundamentals of Decision Making and Priority Theory, 2nd Edition, Pittsburgh, PA. RWS Publication.

      [15] Shrestha, J. Jeong, D. Gransberg, D. 2017. “Multidimensional Highway Construction Cost Indexes Using Dynamic Item Basketâ€. ASCE. J. Constr. Eng. Manage., -1—1, pp. 1.

      [16] Shrestha, K. Shrestha, P. Said, A. Lidder, M. (2016), “Factors Affecting the Selection of In- House and Outsourcing Road Maintenance Methods and Assessment of Their Benefitsâ€. ASCE. J. Infrastruct. Syst., 06016001, pp. 1.

      [17] Shrestha, K. Shrestha, P. (2014), “Evaluation of the Durability of Asphalt Concrete Anti-Skid Performanceâ€. ASCE. Construction Research Congress 2014, pp. 8.

      [18] Suhendra, D. (2014), “Effect of Temperature Variation on Mixing Process on Hotmix Asphalt Mixtureâ€. Thesis. Civil Engineering Department, University of Lampung. Lampung, pp. 5-6.

      [19] Sukirman. S. (2010), Design Flexible Pavement. First Edition. Nova. Bandung.

      [20] Susandi. (2017), “Re-Planning Construction of Pavement Roads Using Cement Treated Recycling Base (Ctrb) as Foundation on Road Asia Raya, Industrial Estate Krakatau Steelâ€, West Cilegon, Bantenâ€. Thesis, Civil Engineering, Mercubuana University. Jakarta, pp. 8-11.

      [21] Tao, Hao. Yang, Li. Zheng hua, Zhang. (2016), “Scheme Optimization of Large-Scale Highway Transport Based on AHP-Grey Correlation Degreeâ€. ASCE. J. Highway Transp. Res. Dev. (English Ed.), 2016, 10(2): 98-102, pp. 1.

      [22] The Legislation of the Republic Indonesia No. 22, (2009), “Traffic and road transportâ€. State of the Republic of Indonesia Tahun 2009. Jakarta, pp. 3.

      [23] Wahyuni, Ani. Miyata, Yuzuru. (2013), “Public Participation in Selection of the Road Construction by Analytic Hierarchy Process for Supporting of CO2 Emissions Reduction: A Case Study of Maros-Watampone Roadâ€. IOSR Journal, pp. 1.

  • Downloads

    Additional Files

  • How to Cite

    Widyaningsih, N., Purwoko Kusumo Bintoro, B., Purwoko Kusumo Bintoro, B., Hidayat Renggah, R., & Hidayat Renggah, R. (2018). The choice of district road construction by the method of analytical hierarchy process and simple multi attribute rating technique. International Journal of Engineering & Technology, 7(4), 2213-2217. https://doi.org/10.14419/ijet.v7i4.16276