Insights into The Adoption of Lean Management in Industrialised Building System (IBS) Implementation: The Drivers and Challenges
-
2018-08-09 https://doi.org/10.14419/ijet.v7i3.23.17253 -
Interpretive structural modelling, lean construction, prefabrication. -
Abstract
The application of lean management is able to improve construction processes. Unnecessary waiting time, overstaffing and risk uncertainty are some of the problems that can be eliminated by adopting lean management. Industrialised Building System (IBS) is a sustainable approach that can be improved construction deliverables with the integration of lean management. However, the adoption or practice of lean management in productions of IBS component productions is still limited. There are only few studies emphases on the interactions among key drivers and hierarchy of lean management key drivers model. This study used Interpretive Structural Modeling (ISM) to interpret relationship of drivers and challenges in integrating lean management in form of ISM based-model and Matrice d’impacts croisés multiplication appliquée an classment (MICMAC). The results from this will improve the adoption of lean management in IBS application.
Â
Â
-
References
[1] Construction Industry Development Board Malaysia. Construction industry transformation programme 2016-2020. http://www.citp.my/2017/wp-content/uploads/0.-CITP-eBook-complete.pdf. Revised September 2015. Accessed February 24, 2016.
[2] M. Solla, L. H. Ismail, & R. Yunus, Investigation on the potential of integrating BIM into green building assessment tools, ARPN Journal of Engineering and Applied Sciences 11(4) (2016) 2412-2418.
[3] M.N.M. Nawi, A. Lee. and K. M. Noor, Barriers to implementation of the industrialised building system (IBS) in Malaysia, Built Human Environment, 4(22) (2011) 22–35.
[4] K.A.M. Kamar, Collaboration initiative on green construction and sustainability through industrialized buildings systems (IBS) in the Malaysian construction industry, International Journal Sustainable Construction Engineering Technology 1(1) (2010).
[5] Z. A. Hamid, Industrialised building system (IBS) in Malaysia: The current state and R&D initiatives, Malaysian Construction Research Journal 2 (2008) 1–11.
[6] S. T. Ariffin, R. Yunus, H. Mohammad, and S. Khalijah, A Preliminary Review on Economies of Scale (EOS) Towards Industrialized Building System (IBS) Manufacturer 03008 (2017).
[7] L. Koskela and G. Howell, The underlying theory of project management is obsolete, Proceedings of the PMI Research Conference 9 (2002).
[8] S. Bertelsen, Modularization - A third approach to making construction lean?, Proceedings of 13th Annual Conference on Lean Construction (2005).
[9] J. Meiling, F. Backlund, and H. Johnsson, Managing for continuous improvement in off-site construction: Evaluation of lean management principles, Engineering Construction Architect Management 19(2) (2012) 141–158.
[10] M. N. A. Azman, M. S. S. Ahamad, and W. M. Wan Husin, Comparative Study on Prefabrication Construction Process, International. Survey. Research. Journal 2(1) (2012) 45–58.
[11] P. A. S. Ern and N. B. Kasim, E-readiness for Industrialised Building System (IBS) components management: Exploratory study in Malaysian construction projects, International Conference Innovation Management Technology Research (2012) 454–459.
[12] L. Koskela, P. Lahdenperä, and V.-P. Tanhuanpää, Sounding the Potential of Lean Construction: A Case Study, Proceedings of 4th Annual Conference on Lean Con-struction (1996).
[13] Y. Luo, D. R. Riley, and M. J. Horman, Design-Build ( Gdb ) Projects (2005) 539–548.
[14] R. Čiarnienė and M. Vienažindienė, An Empirical Study of Lean Concept Manifestation, Procedia-Social and Behavioral Sciences 207 (2015) 225–233.
[15] M. Breit, M. Vogel, F. Häubi, F. Märki, and M. Raps, 4D Design and Simulation Technologies and Process Design Patterns to Support Lean Construction Methods 13 (2008) 179–184.
[16] A. Jaapar, M. A. Marhani, and N. A. A. Bari, Green Lean Construction Tools Framework for Malaysian Construction Industry, Australian Journal of Basic and Applied Sciences (2015).
[17] M. I. Din, N. Bahri, M. A. Dzulkifly, M. R. Norman, A. M. Kamar, and Z. A. Hamid, The adoption of Industrialised Building System (IBS) construction in Malaysia: The history, policies, experiences and lesson learned, Proceedings of the 29th International Symposium of Automation and Robotics in Construction (2007).
[18] N. Raihani, B. Zainol, A. Al-mamun, and P. Y. Permarupan, Overview of Malaysian Modularity Manufacturing Practices, American Journal of Industrial and Business Management (2013) 601–609.
[19] D. Powell, J. O. Strandhagen, I. Tommelein, G. Ballard, and M. Rossi, A new set of principles for pursuing the lean ideal in engineer-to-order manufacturers, Procedia CIRP (2014) 571–576.
[20] R. Yunus, A. Suratkon, M. Wimala, H. Abdul Hamid, and S. R. Mohd Noor, Motivational Factors on Adopting Modular Coordination Concept in Industrialized Building System (IBS), MATEC Web Conference (2016) 04017.
[21] L. S. Pheng and C. J. Chuan, Just-in-time management in precast concrete construction: a survey of the readiness of main contractors in Singapore, Integrated Manufacturing Systems, 12. (2001) 416–429.
[22] M. R. Abdullah and C. Egbu, The Role of Knowledge Management in Improving the Adoption and Implementation Practices of Industrialised Building System (IBS) in Malaysia, CIB World Congress (2010) 1–12.
[23] M. Azwanie, N. Mohammad, M. Nasrun, and M. Nawi, Success Factors of JIT Integration with IBS Construction Projects – A Literature Review, 5(2) (2016) 71–76.
[24] W. Min and L. Sui Pheng, Modeling just-in-time purchasing in the ready mixed concrete industry, International Journal of Production Economics 107(1) (2007) 190–201.
[25] A. T. Haron, A. Marshall-Ponting, M. Nawi, and M. Ismail, Building information modelling: a case study approach to identify readiness criteria for process requirement, American-Eurasian Journal of Sustainable Agriculture (2014) 85.
[26]
International Journal of Engineering & Technology
31
R. Yunus, S. R. M. Noor, A. H. Abdullah, S. Nagapan, A. R. A. Hamid, S. A. A. Tajudin, and S. R. M. Jusof, Critical Success Factors for Lean Thinking in the Application of Industrialised Building System (IBS), IOP Conference Series Material Science Engineering 226 (2017) 012045.
[27] L. H. Forbes and S. M. Ahmed, Modern Construction Management, Taylor and Francis Group, Broken Sound Parkway, USA (2011).
[28] L. Koskela, Lean production in construction, National Construction Management Conference (1994) 47–54.
[29] A. Björnfot and Y. Sardén, Prefabrication a Lean Strategy for Value Generation in Construction, Proceedings 14th International Group for Lean Construction (2006) 265–277.
[30] M. J. Mawdesley and G. Long, Prefabrication for Lean Building, Proceedings 10th International Group for Lean Construction (2002) 1–12.
[31] A. Bjornfot and L. Stehn, Industrialization of Construction- A Lean Modular Approach, Proceedings 14th International Group for Lean Construction (2004) 1–14.
[32] M. Frier, P. H. Kirkegaard, and A. M. Fisker, Architectural intention as the mediator of lean housing construction Proceedings 16th International Group for Lean Construction (2008) 533–540.
[33] K. Parrish, Lean and green construction: Lessons learned from design and construction of a modular leed® gold building, Proceedings 20th International Group for Lean Construction (2012).
[34] H. Yu, M. Al-hussein, M. Asce, S. Al-jibouri, and A. Telyas, Lean transformation in a modular building company: a case for implementation, Journal of Management in Engineering 29(1) (2013) 103–111.
[35] S. Senaratne and S. Ekanayake, Evaluation of Application of Lean Principles to Precast Concrete Bridge Beam Production Process, Journal of Architectural Engineering 18(2) (2012) 94–107.
[36] A. Björnfot, An Engineering Perspective on Lean Construction Theory, Proceedings 16th International Group for Lean Construction (2008) 15–26.
[37] M. Breit and N. Arnold, Digital Simulation in Lean Project Development, Proceedings 18th International Group for Lean Construction (2010) 622–632.
[38] C. Pasquire and G. Connolly, Leaner construction through off-site manufacturing, Proceedings 10th International Group for Lean Construction (2002) 1–13.
[39] E. Brookfield, S. Emmitt, and S. Scaysbrook, The architectural technologist’s role in linking lean design with lean construction, Proceedings of 12th Annual Conference on Lean Construction (2004) 1–13.
[40] K. Parrish and M. Whelton, Lean operations: An energy management perspective, Proceedings of 21st Annual Conference on Lean Construction. (2013) 825–834.
[41] O. Matthews, G. a. Howell, and P. Mitropoulos, Aligning the lean organization: a contractual approach, Proceedings of 11th Annual Conference on Lean Construction (2003).
[42] T. Abdelhamid, ‘Six Sigma in Lean Construction Systems: Opportunities and Challenges, Proceedings of 11th Annual Conference on Lean Construction (2003) 1–16.
[43] Y. Cuperus and H. Voordijk, Exploring the connection between open building and lean construction: Defining a postponement strategy for production, Proceedings of 10th Annual Conference on Lean Construction (2002) 1–12.
[44] P. Jensen, E. Hamon, and T. Olofsson, Product development through lean, Automation in Construction 23 (2006) 465–474.
[45] M. R. Wettig, D. R. Mansilla, and L. F. Alarcón Cárdenas, Organizational improvement methodology for chilean construction industry, Proceedings of 16th Annual Conference on Lean Construction (2008) 211–219.
[46] G. Barbosa, C. Biotto, and B. Mota, Implementing lean construction effectively in a year in a construction project, Proceedings of 21st Annual Conference on Lean Construction (2013) 1017–1026.
[47] M. Luthfi Ahmad Jeni and A. Zainal Abidin Akasah, Implementation of lean construction concept among contractors in Malaysia, The International Conference on Engineering and Built Environment (2013) 0112671200.
[48] R. N. Mariz, F. A. Picchi, A. D. Granja, and R. S. S. De, Production cells in construction: Considering time, space and information linkages to seek broader implementations 3(1) (2013) 46–55.
[49] D. Cupertino, S. Vilarinho, L. Alencar, and T. Do Amaral, Application of the principles of lean thinking in the Post Work Construction Department, Proceedings of 20th Annual Conference on Lean Construction (2012).
[50] M.L. Emiliani, Lean behaviors, Management Decision 36(9) (2014) 615-631.
[51] D. Stoeff and W. Schmeisser, Lean Management, Department of Business Studies, Uppsala University (2015).
[52] M. Hook and L. Stehn, Lean Principles in Industrialized Housing Production: The Need for a Cultural Change Lean Culture, Lean Construction Journal (2008) 20–33.
[53] M. Lennartsson, A. Björnfot, and L. Stehn, Lean modular design: Value-based progress of industrialised housing’, Proceedings of 16th Annual Conference on Lean Construction (2008) 541–552.
[54] F. Hamzeh, The Lean Journey: Implementing the Last Planner System in Construction, Proceedings of 16th Annual Conference on Lean Construction (2011) 1–12.
[55] H. W. Lee, I. D. Tommelein, and G. Ballard, Lean Design Management in an Infrastructure Design-Build Project: A Case Study, Proceedings of 18th Annual Conference on Lean Construction (2010) 113–122.
[56] R. Yunus, A. H. Abdullah, M. N. Yasin, M. A. N. Masrom, and M. H. Hanipah, Examining performance of Industrialized Building System (IBS) implementation based on contractor satisfaction assessment, ARPN Journal Engineering Applied Science 11(6) (2016) 3776–3782.
[57] M. Li and J. Yang, Analysis of interrelationships between critical waste factors in office building retrofit projects using interpretive structural modelling, International Journal Construction Management 14(1) (2014) 15–27.
[58] V. Ahuja, J. Yang, and R. Shankar, Benefits of collaborative ICT adoption for building project management, Construction. Innovation 9(3) (2009) 323–340.
[59] R. K. Singh, S. K. Garg, S. G. Deshmukh, and M. Kumar, Modelling of critical success factors for implementation of AMTs, Journal of Modelling in Management 2(3) (2007) 232–250.
[60] K. A. Rade, V. A. Pharande, and D. R. Saini, Interpretive Structural Modeling (ISM) for Recovery of Heat Energy, International Journal of Theoretical and Applied Mechanics 12(1) (2017) 83–92.
[61] S. S. Kamaruddin, M. F. Mohammad, R. Mahbub, and K. Ahmad, Mechanisation and Automation of the IBS Construction Approach: A Malaysian Experience, Procedia-Social Behavioral Science 105 (2013) 106–114.
[62] R. Ahuja, A. Sawhney, and M. Arif, Prioritizing BIM Capabilities of an Organization: An Interpretive Structural Modeling Analysis, Procedia Engineering 196 (2017) 2–10.
[63] S. Khaba and C. Bhar, Modeling the key barriers to lean construction using interpretive structural Modeling, Journal Modeling Management (2017).
[64] V. Ravi, R. Shankar, and M. K. Tiwari, Productivity improvement of a computer hardware supply chain, Research Journal of Management Sciences 54(4), (2005) 239–255.
[65] F. Talib, Z. Rahman, and M. N. Qureshi, Analysis of interaction among the barriers to total quality management implementation using interpretive structural modeling approach, International Journal of Organizational Analysis 18(4) (2011) 563–587.
[66] K. Mathiyazhagan and A. N. Haq, Analysis of the influential pressures for green supply chain management adoption-an Indian perspective using interpretive structural modeling, International, Journal Advance Manufacturing Technology 68(1) (2013) 817–833.
-
Downloads
-
How to Cite
Rahimah Mohd Noor, S., Yunus, R., Halid Abdullah, A., Nagapan, S., & Mohamad Syahir Syed Mazlan, S. (2018). Insights into The Adoption of Lean Management in Industrialised Building System (IBS) Implementation: The Drivers and Challenges. International Journal of Engineering & Technology, 7(3.23), 22-31. https://doi.org/10.14419/ijet.v7i3.23.17253Received date: 2018-08-09
Accepted date: 2018-08-09
Published date: 2018-08-09