  • The construction industry plays an important role in supporting the development of small to medium-sized enterprises (SME) in Malaysia. SME contractors accounted for about 90 per cent while large contractors make up the remaining of only 10 per cent. One of the main issues highlighted by Construction Industry Development Board (CIDB) in Construction Industry Transformation Plan 2016 – 2020 (CITP 2016 – 2020) is regarding SMEs particularly in the issue of the specialisation of SME contractors, especially Bumiputera contractors in the area of Industrialised Building System (IBS) remains low. Thus, an exploratory survey using questionnaires was undertaken with 30 samples of respondents to explore the challenges of SME contractors in adopting IBS in Malaysia. The findings from the study revealed that the low adoption of IBS among SME contractors is due to three (3) main challenges. The main challenges faced by SME contractors in adopting IBS are lack of IBS knowledge, lack of financial backup and clients’ preference of conventional method over IBS. The findings will be used for the development of a business model framework for SME contractors (not reported in this paper).

     

  • References

    1. [1] BNM, “Annual Report 2017,†Kuala Lumpur, 2017.

      [2] CIDB, Construction Industry Transformation Programme 2016 - 2020. Kuala Lumpur, Malaysia: Construction Industry Development Board (CIDB), 2015.

      [3] A. R. Bin Ibrahim, M. H. Roy, Z. Ahmed, and G. Imtiaz, “An investigation of the status of the Malaysian construction industry,†Benchmarking An Int. J., vol. 17, no. 2, pp. 294–308, 2010.

      [4] CIDB, “Industrialised Building Systems (IBS) Roadmap 2003-2010.†Construction Industry Development Board (CIDB), Kuala Lumpur, 2003.

      [5] M. I. Din, N. Bahri, M. A. Dzulkifly, M. R. Norman, K. A. M. Kamar, and Z. A. Hamid, “The adoption of Industrialised Building System (IBS) construction in Malaysia: The history, policies, experiences and lesson learned,†in Proceedings of the 2012 29th International Symposium of Automation and Robotics in Construction (ISARC), Eindhoven, The Netherlands, 2012, pp. 26–29.

      [6] CIDB, Industrialised Building Systems in Malaysia. Construction Industry Development Board Malaysia, Kuala Lumpur, 2016.

      [7] K. A. M. Kamar, M. N. A. Azman, and M. N. M. Nawi, “IBS survey 2010: Drivers, barriers and critical success factors in adopting industrialised building system (IBS) construction by G7 contractors in Malaysia,†J. Eng. Sci. Technol., vol. 9, no. 4, pp. 490–501, 2014.

      [8] T. A. Majid, M. N. A. Azman, S. A. S. Zakaria, A. S. Yahya, S. S. Zaini, M. S. S. Ahamad, and M. H. Hanafi, “Quantitative Analysis on the Level of Ibs Acceptance in the Malaysian Construction Industry,†J. Eng. Sci. Technol., vol. 6, no. 2, pp. 179–190, 2011.

      [9] Z. A. Hamid, K. A. . Kamar, M. Z. M. Zain, M. K. Ghani, and A. H. A. Rahim, “Industrialised Building System (IBS) in Malaysia : The current state and R&D initiatives,†Malaysian Constr. Res. J., vol. 2, no. 1, pp. 1–13, 2008.

      [10] M. C. Theong, “Implications of Industrialised Building System on Trade Contractors in Malaysia, unpublished thesis (PhD ),†University Teknology Malaysia, Malaysia, 2015.

      [11] E. M. Kamal and R. Flanagan, “Understanding absorptive capacity in Malaysian small and medium sized (SME) construction companies,†Journal of Engineering, Design and Technology, vol. 10, no. 2. pp. 180–198, 2012.

      [12] V. Benjaoran, “A cost control system development: A collaborative approach for small and medium-sized contractors,†Int. J. Proj. Manag., vol. 27, no. 3, pp. 270–277, 2009.

      [13] E. Goh and M. Loosemore, “The impacts of industrialization on construction subcontractors: a resource based view,†Constr. Manag. Econ., vol. 6193, no. February, pp. 1–18, 2016.

      [14] E. C. W. Lou and K. A. M. Kamar, “Industrialized Building Systems: Strategic Outlook for Manufactured Construction in Malaysia,†J. Archit. Eng., vol. 18, no. 2, pp. 69–74, 2012.

      [15] S. A. S. Zakaria, T. Gajendran, T. Rose, and G. Brewer, “Contextual, structural and behavioural factors influencing the adoption of industrialised building systems: a review,†Archit. Eng. Des. Manag., vol. 0, no. 0, pp. 1–24, 2017.

      [16] M. I. Mohamad, M. Zawawi, and M. a Nekooie, “Implementing Industrialised Building System (IBS) in Malaysia : Acceptance and Awareness Level, Problem and Strategies,†Malaysian J. Civ. Eng., vol. 21, no. 2, pp. 219–234, 2009.

      [17] K. A. M. Kamar, Z. A. Hamid, M. K. Ghani, A. H. A. Rahim, M. Z. M. Zain, and F. Ambon, “Business strategy of large contractors in adopting industrialised building system (IBS): The Malaysian case,†J. Eng. Sci. Technol., vol. 7, no. 6, pp. 774–784, 2012.

      [18] K. A. M. Kamar, M. Alshawi, and Z. A. Hamid, “Industrialised building system: the critical success factors,†Int. Postgrad. Res. Conf. (IPGRC 2009), 2009.

      [19] K. A. M. Kamar, Z. A. Hamid, and M. Alshawi, “The critical success factors (CSFs) to the implementation of industrialised building system (IBS) in Malaysia,†in Proceedings in CIB World Congress 2010, Salford, 2010, pp. 10–13.

      [20] A. B. A. Rahman and W. Omar, “Issues and challenges in the implementation of industrialised building systems in Malaysia,†in Proceedings of the 6th Asia-Pacific Structural Engineering and Construction Conference, 2006, no. September, p. C-45-C-53.

      [21] Y. F. Badir, M. R. A. Kadir, and A. H. Hashim, “Industrialized Building Systems Construction in Malaysia,†J. Archit. Eng., vol. 8, no. 1, pp. 19–23, 2002.

      [22] W. Pan, A. G. F. Gibb, and A. R. J. Dainty, “Leading UK housebuilders’ utilization of offsite construction methods,†Build. Res. Inf., vol. 36, no. 1, pp. 56–67, 2008.

      [23] A. Gibb and F. Isack, “Re-engineering through pre-assembly: client expectations and drivers,†Build. Res. Inf., vol. 31, no. 2, pp. 146–160, Jan. 2003.

      [24] CIDB, “IBS Digest Issue 1 2017,†IBS Centre, Construction Industry Developement Board, pp. 29–29, 2017.

      [25] Z. A. Hamid, K. A. M. Kamar, M. K. Ghani, M. Z. Mohd Zain, and A. H. A. Rahim, “Business Strategies of Contractors in Industrialised Building Systems (IBS) Construction,†in International Construction Business and Management Symposium (ICBMS 2011), 2011, no. September, pp. 148–155.

      [26] CIDB, “Industrialised building systems (IBS) - roadmap 2011-2015,†2011.

      [27] N. Dzulkalnine, M. N. A. Azman, K. W. Bing, N. F. Habidin, and A. R. Ayub, “Issues of payment procurement process for industrialised building system (IBS) project,†J. Teknol., vol. 78, no. 5–10, pp. 11–15, 2016.

      [28] M. Samari, N. Ghodroti, and M. W. M. Shafiei, “The Implementation of Industrialized Building System ( IBS ) in Iran Construction Companies,†J. Mech. Civ. Eng., vol. 1, no. 3, pp. 19–24, 2012.

      [29] M. Waris, M. S. Liew, M. F. Khamidi, and A. Idrus, “Investigating the awareness of onsite mechanization in malaysian construction industry,†Procedia Eng., vol. 77, pp. 205–212, 2014.

      [30] A. Leontitsis and J. Pagge, “A simulation approach on Cronbach’s alpha statistical significance,†Math. Comput. Simul., vol. 73, no. 5, pp. 336–340, 2007.

  • Downloads

  • How to Cite

    Rizal Mohamed, M., Fadhil Mohammad, M., Mahbub, R., Adib Ramli, M., & Aizat Ahmad Jamal, K. (2018). The Issues and Challenges of Small and Medium-Sized Contractors in Adopting Industrialised Building System. International Journal of Engineering & Technology, 7(3.25), 432-436. https://doi.org/10.14419/ijet.v7i3.25.17725