Factors impeding the industrialized building system (IBS) implementation of building construction in Malaysia
-
2018-09-16 https://doi.org/10.14419/ijet.v7i4.17863 -
Industrialized Building System, IBS, Construction, Barriers of IBS. -
Abstract
In Malaysian construction industry, Industrialised Building System (IBS) has been introduced to replace the traditional construction method. While the government has been making significant efforts to encourage the IBS adoption, the uptake of IBS in Malaysia construction projects remains low. This study seeks to identify the barriers to the uptake of IBS and to propose the strategies to enhance the implementation IBS in Malaysian housing construction process from the perspectives of consultants. Interviews were conducted with five selected experienced individuals who were working with consultants (civil and structure engineer and quantity surveyor). The results revealed that, lack of knowledge and insufficient skilled workers are the main factors that impede the IBS uptake in Malaysia. Meanwhile, the most strategy proposed by the interviewees is to increase the facilities and incentives in order to expand research and development in IBS.
Â
Â
-
References
[1] CIDB (2015). Construction Industry Transformation Programme (CITP) 2016-2020 Driving Construction Excellent Together. Kuala Lumpur: Construction Industry Development Board.
[2] Thanoon WAM, Lee WP, Kadir MRA, Jaafar MS, Salit MS The Experiences of Malaysia and Other Countries in Industrialised Building System Proceeding of International Conference Industrialised Building Systems 10-13 September 2003.
[3] Abas, NH, Blismas N, Lingard, H Knowledge-Based Energy Damage Model for Evaluating Industrialised Building System (IBS) Occupational Health and Safety (OHS) Risk The 3rd International Conference on Civil and Environmental Engineering for Sustainability (IConCEES 2015) 2016 1-7.
[4] Junid SMS. Industrialised Building System. Proceedings of UNESCO/ FEISEAP Regional Workshop, Universiti Putra Malysia (UPM) Serdang 1986.
[5] Lee, R IBS Adoption in Malaysia Remains Low The Edge Property 2015, December 31.
[6] Idris AN Minister: IBS To Be Compulsory For Construction Projects in 2018 (2017, March 21) Retrieved from http://www.theedgemarkets.com/article/minister-ibs-be-compulsory-construction-pr.
[7] Kamar KAM, Alshawi M, Hamid ZA Barriers to Industrialized Building System (IBS): The Case of Malaysia. Built and Human Environment 9th International Postgraduate Research Conference 2009 1–16.
[8] Nawi MNM, Lee A, nor KM Barriers to Implementation of the Industrialised Building System (IBS) in Malaysia. The Built & Human Environment Review 4 2011 22-35.
[9] Amin MA, Abas NH, Shahidan S, Rahamt MH, Suhaini NA, Nagapan S, Abdul Rahim R A review on the current issues and barriers of Industrialised Building System (IBS) adoption in Malaysia’s construction industry GCoMSE2017 28-29 August 2017 Johor Bahru, Malaysia. IOP Publishing; 2017.
[10] Kamar KAM, Alshawi M Hamid ZA Barriers to Industrialized Building System (IBS): The case of Malaysia. Proceedings of the BuHu 9th International Postgraduate Research Conference (IPGRC), Salford. 2009 1–16.
[11] Mirza SNI Critical Success Factors and Barriers for Industrialized Building System (IBS) Adoption in Construction Project. Bachelor is Degree Thesis. Universiti Malaysia Pahang;2010.
[12] Kamar KAM, Hamid ZA, Dzulkalninea N Industrialised Building System (IBS) construction: Measuring the perception of contractors in Malaysia IEEE Business, Eng. Ind. Appl. Colloq Kuala Lumpur, Malaysia IEEE; 2012 328– 333.
[13] Meynagh MM, Marsono AK, Kamar KAM, Isaabadi MHZ. Main Factors of Contractor Reluctancy to Adopt IBS Projects in Malaysia. Australian Journal of Basic and Applied Sciences. 2014 Dec; 8(18) 251-254.
[14] Nawi MNM, Mydin MAO, Nursal AT, Nifa FAA, Bahaudin AY. Payment issues in Malaysia Industrialised Building System (IBS). Adv. in Env. Biol. 2015 9 185–188.
[15] CIDB 2007 Roadmap Review: Implementing the IBS Roadmap 2003-2010. Kuala Lumpur: Construction Industry Development Board.
[16] Rahman ABA, Omar, W. Issues and Challenges in the Implementation of Industrialised Building Systems in Malaysia. Proceedings of the sixth Asia-Pacific Structural Engineering and Construction Conference (APSEC). 2006.
[17] Nawi MNM, Radzuan K, Salleh NA, Ibrahim SH. 2014 Value management: A strategic approach for reducing faulty design and maintainability issue in IBS building. Adv. Environ. Biol. 2014 8 1859-1864.
[18] Hamid Z, Kamar KAM, Zain M, Ghani K, Rahim AHA. Industrialized Building System (IBS) in Malaysia: The Current State and R&D Initiatives. Malaysia Construction Research Journal (MCRJ) 2008 2(1) 1-13.
[19] Wong SS, Lau LK. Advantages and Setbacks of Industrialized Building System (IBS) Implementation: A Case Study in Sarawak. International Journal of Sustainable Construction Engineering & Technology. 2015 6(1) 52-61.
[20] Nawi MNM, Lee A, Arif M. The IBS barriers in the Malaysian construction industry: a study in construction supply chain perspective. In Proceedings: Industrialisation in Construction, CIB, Rotterdam, the Netherlands. CIB Publication 2010 354 77–92.
[21] Majid TA, Azman MNA, Zakaria SAS, Zaini SS, Yahya AS, Ahamad MSS, Hanafi M H. The Industrialised Building System (IBS) survey report 2008 - Educating the Malaysian construction industry. In 2nd International Conference on Computer Research and Development (ICCRD 2010). 2010 615–619 https://doi.org/10.1109/ICCRD.2010.132.
-
Downloads
-
How to Cite
Md. Ali, M., Haslinda Abas, N., Mohd Affandi, H., & Ain Abas, N. (2018). Factors impeding the industrialized building system (IBS) implementation of building construction in Malaysia. International Journal of Engineering & Technology, 7(4), 2209-2212. https://doi.org/10.14419/ijet.v7i4.17863Received date: 2018-08-18
Accepted date: 2018-08-24
Published date: 2018-09-16