Real time implementation and validation of lean implementation model for sustainability (LIMS) in medium scale industry

  • Authors

    • S Gunasekharan
    • D Elangovan
    • S Sudhakara Reddy
    • M Maheswari
    2018-08-24
    https://doi.org/10.14419/ijet.v7i3.29.18453
  • Lean Manufacturing, ISM, LIMS, Critical Success Factor (CSF).
  • Abstract

    Lean manufacturing is a strategic tool, which is used to cut down waste and to improve the efficiency of an organization and helps the organization to sustain in the competitive environment. Implementation of lean systems in organization results in reduce energy consumption, waste generation, and hazardous materials used while also building the companies’ images as socially responsible organizations. Several research efforts discussed in the literature indicate that lean companies show significant environmental improvements by being more resource and energy efficient. Lean systems are associated with waste reduction techniques. In foreign, many industries have started implementing these concepts and they are getting good results. In India, companies are facing problems in implementing lean concept. Critical success factors for lean system implementation in Indian medium scale manufacturing industries has been identified to overcome it. The factors are grouped into different levels by Interpretive Structural Modelling (ISM). A lean implementation model has been developed for medium scale industry and named as 'LIMS'. This paper investigates the implementation and validation of the LIMS through the real time implementation in a medium scale industry.

     

  • References

    1. [1] Achanga, Pius Coxwell, et al. "Lean manufacturing for SMEs: enabling rapid response to demand changes." (2005).

      [2] Bergmiller, Gary G., and Paul R. McCright. "Lean manufacturers’ transcendence to green manufacturing." Proceedings of the 2009 Industrial Engineering Research Conference. Vol. 30. 2009.

      [3] Bergmiller, Gary G., and Paul R. McCright. "Parallel models for lean and green operations." Proceedings of the 2009 Industrial Engineering Research Conference, Miami, FL. 2009.

      [4] Bhasin, Sanjay, and Peter Burcher. "Lean viewed as a philosophy." Journal of manufacturing technology management 17.1 (2006): 56-72.

      [5] Browning, Tyson R., and Ralph D. Heath. "Reconceptualizing the effects of lean on production costs with evidence from the F-22 program." Journal of Operations Management 27.1 (2009): 23-44.

      [6] Cezar Lucato and Wagner, "Performance evaluation of lean manufacturing implementation in Brazil." International Journal of Productivity and Performance Management 63.5 (2014): 529-549.

      [7] Chikhalikar, Pratik, and Suman Sharma. "Implementation of Lean Manufacturing in an Engine Manufacturing Unit—A Review." International Journal of Mechanical Engineering and Robotics Research 4.1 (2015): 404.

      [8] Cua, Kristy O., Kathleen E. McKone, and Roger G. Schroeder. "Relationships between implementation of TQM, JIT, and TPM and manufacturing performance." Journal of Operations Management 19.6 (2001): 675-694.

      [9] Diaz-Elsayed, Nancy, et al. "Assessment of lean and green strategies by simulation of manufacturing systems in discrete production environments." CIRP Annals-Manufacturing Technology 62.1 (2013): 475-478.

      [10] Flynn, Barbara B., Roger G. Schroeder, and Sadao Sakakibara. "A framework for quality management research and an associated measurement instrument." Journal of Operations management 11.4 (1994): 339-366.

      [11] Fullerton, Rosemary R., Cheryl S. McWatters, and Chris Fawson. "An examination of the relationships between JIT and financial performance."Journal of Operations Management 21.4 (2003): 383-404.

      [12] Marasini, Bikash, et al. "A model for implementation of lean manufacturing in Indian small scale industries." International Journal of Science, Engineering and Technology Research (IJSETR) 3.5 (2014).

      [13] McKone, Kathleen E., Roger G. Schroeder, and Kristy O. Cua. "The impact of total productive maintenance practices on manufacturing performance." Journal of operations management 19.1 (2001): 39-58.

      [14] Narasimhan, Ram, Morgan Swink, and Soo Wook Kim. "Disentangling leanness and agility: an empirical investigation." Journal of operations management 24.5 (2006): 440-457.

      [15] Nellore, Rajesh, Jean-Jacques Chanaron, and Klas Eric Söderquist. "Lean supply and price-based global sourcing—the interconnection." European Journal of Purchasing & Supply Management 7.2 (2001): 101-110.

      [16] Nellore, Rajesh, Klas Söderquist, and Kjell-Åke Eriksson. "A specification model for product development." European Management Journal 17.1 (1999): 50-63.

      [17] Ping-yu, Yang. "The barriers to SMEs implementation of lean production and its countermeasures–based on SMEs in Wenzhou." Reform Strategy 1 (2009): 148-151.

      [18] Rojasra, P. M., and M. N. Qureshi. "Performance improvement through 5S in small scale industry: a case study." International Journal of Modern Engineering Research 3.3 (2013): 1654-1660.

      [19] Roos, Daniel, James P. Womack, and Daniel Jones. "The Machine That Changed the World: The Story of Lean Production." Rawson/Harper Perennial, New York (1990).

      [20] Samson, Danny, and Mile Terziovski. "The relationship between total quality management practices and operational performance." Journal of operations management 17.4 (1999): 393-409.

      [21] Shah, Rachna, and Peter T. Ward. "Defining and developing measures of lean production." Journal of operations management 25.4 (2007): 785-805.

      [22] Upadhye, Nitin, S. G. Deshmukh, and Suresh Garg. "Lean manufacturing system for medium size manufacturing enterprises: an Indian case."International Journal of Management Science and Engineering Management5.5 (2010): 362-375.

  • Downloads

  • How to Cite

    Gunasekharan, S., Elangovan, D., Sudhakara Reddy, S., & Maheswari, M. (2018). Real time implementation and validation of lean implementation model for sustainability (LIMS) in medium scale industry. International Journal of Engineering & Technology, 7(3.29), 16-20. https://doi.org/10.14419/ijet.v7i3.29.18453

    Received date: 2018-08-28

    Accepted date: 2018-08-28

    Published date: 2018-08-24