Construction Period Analysis of HPC Method by PC Construction Project Cases in KOREA
-
https://doi.org/10.14419/ijet.v7i3.7.18901 -
HPC method, hollow PC column, construction period, half-slab method -
Abstract
This study was conducted as basic research for applying HPC method to building construction sites. HPC method was compared with an existing method (Half-slab method) for the analysis on a construction period. As a study method, this researcher analyzed the drawings and construction plans of the cases of the buildings constructed with Half-slab method. The analyzed seven buildings used as cases were domestically built within the last 5 years. According to the analysis, cases A and B that had columns divided for construction shortened about 16% of a construction period. The schedule of column assembly work was analyzed to be shortened much. That is judged to be because the use of a hollow PC column leads to a decrease in the number of columns. In particular, if HPC method is applied to a building construction site using large columns, it is analyzed to shorten a construction period more than the existing Half-slab method.
Â
Â
-
References
[1] S. H. An., et al., A Study on the Proposal about the Improvement of PC in Construction Industry, Journal of Korea Institute of Building Construction, 2004. 20(7): p. 33-40.
[2] D. H. Sin., Structural Capacity of the Exterior Beam-Column Joint Using Hollow Precast Concrete Column, Master’s thesis Korea National University of Transportation, Korea. 2016.
[3] S. J. Lee., A Compressive Behavior of Hollow Precast Concrete Column, Master’s thesis Korea National University of Transportation, Korea. 2014.
[4] B. R. Nam., Structural Capacity of Mortar-filled Head Splice Sleeve, Master’s thesis Korea National University of Transportation, Korea. 2016.
[5] W. Y. Lim., et al., A Study on the Proposal about the Improvement of PC in Construction Industry, Journal of Korea Institute of Building Construction, 2014. 26(1): p. 35-46.
[6] Kimoondang., Korea Society of Architectural Hybrid System, Korea precast prestressed concrete association, Precast concrete, Korea.
-
Downloads
-
How to Cite
Kim, J., & Won, J. (2018). Construction Period Analysis of HPC Method by PC Construction Project Cases in KOREA. International Journal of Engineering & Technology, 7(3.7), 440-443. https://doi.org/10.14419/ijet.v7i3.7.18901Received date: 2018-09-04
Accepted date: 2018-09-04