Expected Time to Recruitment for a Three Grade Manpower System with Bivariate Policy of Recruitment Using Geometric Process for Inter Decision Times
-
https://doi.org/10.14419/ijet.v7i3.34.19455 -
Manpower Planning, Ordinary Renewal process, Bivariate max policy of recruitment, Geometric Process, Threshold, Expected Mean -
Abstract
In this paper the time to recruitment is studied using bivariate max policy of recruitment for a three grade manpower system with attrition generated by its policy decisions. It is assumed that the threshold distribution for all the three grades is exponential and the inter decision times forms geometric process. The analytical results are substantiated with numerical illustration.
Â
-
References
[1] D.J.Baratholomew, Stochastic model for social processes, (John Wiley and Sons,NewYork,1973).
[2] R.C.Grinold and K.T.Marshall, Manpower Planning Models, (North –Holland, New York, 1977).
[3] K.P.Uma, A Study on Manpower models with univariate and bivariate policies of recruitmenmt, doctoral diss, Avinashilingam University for women, Coimbatore, 2010.
[4] Freund.J.E.(1961), “A bivariate extension of the exponential distributionâ€, J.Amer statist.Assn., Vol.56, 971-977.
[5] G.Ishwarya, N.Sivaranjani and A.Srinivasan, Expected time to recruitment in a single grade manpower system with inter-decision times as a geometric process, Bonfring International Journal of Man Machine Interace, 2(1),2012, 07-10.
[6] J.B.Esther Clara, Contributions to the study on some stochastic models in manpower planning, doctoral diss, Bharathidasan University, Tiruchirappalli, 2012.
[7] Shayamala.R (2010), “ A stochastic model on the time torecruitment in a three grade manpower Systemâ€, M.Phil Dissertation, Bharathidasan University.
[8] [8] J.Medhi, Stochastic Processes, [Wiley Eastern, Second Edition, New Delhi, 1994]. [9] A.Devi and A.Srinivasan, Variance of time to recruitment for single grade Manpower system with different epochs for decision and exists, International Journal of Research in Mathematics and computations, 2,2014,23-27.
[9] A.Devi and A.Srinivasan, A Stochastic model for time to recruitment in a single grade manpower system with different epochs for decisions and exists having inter decision times as geometric process, Second International conference on Business
Analytics and Intelligence,(ICBAI), 2014.
[10] G.Ravichandran and A.Srinivasan, Time to recruitment for a single grade manpower system with two thresholds, different epochs for exists and inter-decisions (IOSR Journal of Mathematics) Volume II, ISSUE 2, VER.III (Mar – Apr 2015), pp-29-32.
[11] A.Srinivasan and S.Vidhya, A manpower model or a two grade system with bivariate policy of recruitment, International Review of Pure and Applied
Mathematics, Volume 6, No 1,pp: 105-112.
[12] S.Vidhya, A Study on some stochastic models for a multigraded manpower system, doctoral diss, Bhatathidasan University, Tiruchirappalli, Dec 2011.
-
Downloads
-
How to Cite
Samundeeswari, D., Vidhya, S., & Chitra Kalarani, T. (2018). Expected Time to Recruitment for a Three Grade Manpower System with Bivariate Policy of Recruitment Using Geometric Process for Inter Decision Times. International Journal of Engineering & Technology, 7(3.34), 702-704. https://doi.org/10.14419/ijet.v7i3.34.19455Received date: 2018-09-11
Accepted date: 2018-09-11