 The shipbuilding and ship repair industry in Malaysia involves designing, building and constructing, repairing and maintaining, converting and upgrading of vessels as well as marine equipment. It is getting larger and always evolve in line with the development of technology such as with the latest technology which is embedded in modular construction. Nowadays, the modular construction approach in shipbuilding is already known worldwide. However, adoption of this method in Malaysia is still minimal in term of scale and it is not comprehensive. The latest, Boustead Naval Shipyard (BNS) was entrusted to build 6 Littoral Combat Ship (LCS) for Royal Malaysian Navy (RMN) in BNS in Lumut, Malaysia. One of the advantages for this contract is the technology transfer which also includes the modular construction. The study is conducted using the qualitative and quantitative method. Qualitative data collection method that used in this study includes individual interviews, and observations to examine the perspective from the higher management level on how to assess modular construction shipbuilding and hence to examine the factors through implementation and the effectiveness towards Malaysia’s shipyard of modular construction shipbuilding. For quantitative data collection method include various forms of surveys – online and form survey. Respondents are only from the higher management level. This data will be transformed into usable statistics using statistical software, Statistical Package for the Social Sciences (SPSS). Thus, this study is to analyse the technology and the viability in which to investigate of the existing business sustainability construction shipbuilding in Malaysia’s Shipyard. The result can be used for the better understanding the modular construction and its impact on the production process in Malaysia, and also improve the technology and method of modular construction shipbuilding in Malaysian shipyard.
-
References
[1] Kamarulzaman Zainal, A.M.N., Sri Widias Tuti Asnam Rajo Intan, Norfarkhana Mahfar, Dzurriyatie Shahirah Abd Jalil,, Malaysian Shipbuilding & Ship Repair 2015 & 2016.
[2] Jolliff and J. V, Modular ship design concepts. Naval Engineers Journal, 1974. 86(5): p. 11-32.
[3] Erikstad, S., Modularisation in shipbuilding and modular production. Innovation in Global Maritime Production, 2009.
[4] Gabriel Collins and L.C.M.C. Grubb, A comprehensive survey of China’s dynamic shipbuilding industry. China Maritime Studies, US Naval War College, 2008(1).
[5] Kolić, D., N. Fafandjel, and A. Zamarin, Lean Manufacturing Methodology for Shipyards. Brodogradnja, 2012. 63(1): p. 18-29.
[6] Institute, N.B., Improving Construction Effi ciency & Productivity with Modular Construction. 2010.
[7] Bertram, V., Modularization of ships. Report within the framework of Project" Intermodul" s/03/G IntermareC, 2005. 28.
[8] Seubert, T.W., Modular Shipbuilding and Its Relevance to
Construction of Nuclear Power Plants. 1988.
[9] Kolić, D., N. Fafandjel, and R. Rubeša, Applying lean quality with risk analysis to aid shipyard block assembly decision making. Strojarstvo, 2011. 53(2): p. 73-82.
[10] Zoolfakar, M. and M. Manaf, A Review of Modular Construction at Lumut Port. Marine Frontier, 2013.
[11] Lean Manufacturing Tools. The Waste of Overproduction. 2016 [cited 2016 7 August]; Available from: http://leanmanufacturingtools.org/114/waste-of-overproduction-causes-symptoms-examples-and-solutions/.
[12] Koto, J. and M. Nakisa, Marine Education and Research Development in Malaysia. Jurnal Teknologi, 2014. 69(7).
[13] Sekaran, U. and R. Bougie, Research methods for business: A skill building approach. 2016: John Wiley & Sons.
[14] Pedhazur, E.J. and L.P. Schmelkin, Measurement, design, and analysis: An integrated approach. 2013: Psychology Press.
[15] Hamada, K., et al., Comparative Analysis of Shipbuilding Industries among Japan and Southeast Asian Nations. è¥¿éƒ¨é€ èˆ¹ä¼šä¼šå ±, 2003(106): p. 99-113.
[16] Van de Ven, A.H. and D.L. Ferry, Measuring and assessing organizations. 1980: John Wiley & Sons.
[17] Salkind, N.J. and T. Rainwater, Exploring research. 2003: Prentice Hall Upper Saddle River, NJ.
[18] Anuar Mohd Noor, Malaysia’s Shipbuilding Industry-Shifting
Toward Sustainability. Myforesight 2012. 4th Edition.
[19] Jaillon, L.C., The evolution of the use of prefabrication techniques in Hong Kong construction industry. 2009, Department of Civil and Structural Engineering, the Hong Kong Polytechnic University.
[20] Haas, C.T. and W.R. Fagerlund, Preliminary research on prefabrication, pre-assembly, modularization and off-site fabrication in construction. 2002.
[21] Lu, N., The current use of offsite construction techniques in the United States construction industry. Seattle, Washington, 2009: p. 96-96.
[22] Jaillon, L. and C.S. Poon, Design issues of using prefabrication in Hong Kong building construction. Construction Management and Economics, 2010. 28(10): p. 1025-1042.
[23] Lawson, R.M., R.G. Ogden, and R. Bergin, Application of modular construction in high-rise buildings. Journal of architectural engineering, 2011. 18(2): p. 148-154.
[24] Chiang, Y.-H., E.H.-W. Chan, and L.K.-L. Lok, Prefabrication and barriers to entry—a case study of public housing and institutional buildings in Hong Kong. Habitat International, 2006. 30(3): p. 482-499.
[25] Rahman, M.M., Barriers of implementing modern methods of construction. Journal of Management in Engineering, 2013. 30(1): p. 69-77.
-
Downloads
-
How to Cite
Mokhtar, A. A. A., Amir, M. A. U., Hafizah, A., & Halim, A. (2018). Technology foresight in Modular Construction Shipbuilding Industries: The Case of Malaysia’s Shipyard. International Journal of Engineering & Technology, 7(4.29), 18-24. https://doi.org/10.14419/ijet.v7i4.29.21836Received date: 2018-11-27