New approach of Cultural Property Fire Fighting System with Building Information Modeling (BIM) and Drone

  • Authors

    • Shinjo Eom
    • Sangchul Kim
    https://doi.org/10.14419/ijet.v7i3.24.22826
  • Cultural property, Building Information Modeling, Drone, Fire fighting, Fire response system
  • Abstract

    Background/Objectives: Preventing the fire of cultural properties is a very important issue, but it is difficult to suppress the fire early due to the wooden structure of cultural properties.

    Methods/Statistical analysis: The research team proposed a monitoring system using Building Information Modeling (BIM) and a fire suppression system using drone. It is constructed a cultural information integration model (BIM) which is constructed by including attribute and physical information based on laser scanning information, so could obtain the object's attributes information into BIM data to respond to cultural assets fire response system.

    Findings: From literature review, there is no fire prevention standard considering its special nature based on the Cultural Properties Protection Act and the possibility of fire due to the deterioration of electric facilities. Therefore, the research team proposed a fire monitoring system with a drone that was connected with the fire detection system that is described as development of internet of things (IoT) converged real-time fire monitoring system based on the integrated building information model (BIM) with infrared heat-seeking sensor camera and development of robotic fire fighting device and/or drone fire system that enables optimal fire response by XYZ coordinate of fire point that is linked to real-time fire monitoring system. Through this, the research team could get an advantage that fire can be extinguished in early by integrating fire position information received from a fire monitoring system connected with fire detection sensor based on drone.

    Improvements/Applications: The proposed system could lead overall facility layout plan with virtual simulation system, reduce damages by hydraulic pressure. Finally, precise fire response and minimal damages were expected in the event of a cultural property fire.

     

     

  • References

    1. [1] Choi, B. (2009). A Study on Safety Management of Cultural Property Fire Fighting(Masters dissertation). School of Industrial Information, Kyonggi University, Korea.

      [2] Jung, E. (2012).A Study on Disaster Prevention Measures for Wooden Cultural Assets using Smart Phone(Masters dissertation). Dept. of Safety Engineering, Yongnam University, Korea

      [3] Hague, D. (2012). Inspection, Testing, and Monitoring of Building and Bridges. ICC

      [4] Cultural Heritage Administration of Korea. (2013). Retrieved from http://www.prism.go.kr/homepage/researchCommon/downloadResearchAttachFile.do;jsessionid=58A4248840A6CBB81BFBD8ADBE2091DC.node02?work_key=001&file_type=CPR&seq_no=002&pdf_conv_yn=N&research_id=1550000-201300020

      [5] Choi, J. (2014). A Study on the Development of a BIM Design Tool for Hanok Windows and Doors, Journal of the Korea Academia-Industrial Cooperation Society, 15(12), 7331-7339.

      [6] Kumar, P. Balasubramanian, M. Jagadish, S. (2016). Robotics in construction industry. Indian Journal of Science and Technology. 9(23), pp. 1-12. doi: 10.17485/ijst/2016/v9i23/95974

      [7] Ahn, E. Kim, J. (2011) Efficient Description Method for Hanok Components Reflecting Coupling Scheme of Wooden Structure, Journal of Korea Multimedia Society. 687-691.doi: 10.9717/kmms.2011.14.2.318

      [8] Choi, H. Kim, S.(2015). Classification System of BIM based Spatial Information for the Preservation of Architectural Heritage - Focused on the Wooden Structure. Korean Institute of Interior Design Journal. 24(1), 207-215. doi: 10.14774/JKIID.2015.24.1.20

      [9] Lee, N. Yun, S.(2016). An Analysis of the BIM Adoption Time in Building Construction Industries in Korea, Indian Journal of Science and Technology. 9(41), 1-5.doi: 10.17485/ijst/2016/v9i41/103957

      [10] NBS National BIM Report 2014 (2014). Retrieved fromhttps://buildingsmart.no/sites/buildingsmart.no/files/nbs-national-bim-report-2014.pdf

  • Downloads

  • How to Cite

    Eom, S., & Kim, S. (2018). New approach of Cultural Property Fire Fighting System with Building Information Modeling (BIM) and Drone. International Journal of Engineering & Technology, 7(3.24), 618-622. https://doi.org/10.14419/ijet.v7i3.24.22826

    Received date: 2018-12-02

    Accepted date: 2018-12-02