Probabilistic Aspects of Main Oil and Gas Pipelines Connections Calculation
-
2018-10-13 https://doi.org/10.14419/ijet.v7i4.8.27210 -
connections calculating method, main pipelines, failure-free operation probability, flanged connections, single failure, structural schemes method. -
Abstract
The article analyzes the existing calculation methods and highlights the main stages of main pipelines flanged connections calculation. A logical-structural scheme for the pipeline connection destruction is proposed. On the basis of the scheme developed, the analysis of usual flange connection destruction was carried out. As a result, formulas for determining safety characteristics of connection elements and equations for determining the failure-free operation probability for both individual elements of the connection and the connection as a whole were obtained.
Â
 -
References
[1] SNiP 2.05.06-85. Magistral'nyye truboprovody. TSITP Gosstroya SSSR, (1988), 52 p.
[2] R. Walczak, J. Pawlicki, A. Zagórski,â€Tightness and material aspects of bolted flange connections with gaskets of nonlinear properties exposed to variable loadsâ€, Arch. Metall. Mater., Vol.61, No.3, (2016), pp:1063-1070, http://dx.doi.org/ 10.1515/amm-2016-0231.
[3] Speight J.G., Oil and Gas Corrosion Prevention, From Surface Facilities to Refineries, (2014), Elsevier, pp. 109–149.
[4] ASME-b16.5-2003. Pipe flanges and flanged fittings, ASME, (2008), 234 p.
[5] DIN v 2505. Calculation of flanged joints, Germany, (1986), 298 p.
[6] Paolacci F., Reza Md. S., Bursi O. S.â€Seismic design criteria of refinery piping systemsâ€, III eccomas thematic conference on computational methods in structural dynamics and earthquake engineering, Vol.7, No.2, (2011), pp:142-147.
[7] Chirkov V.P., “Prikladnyye metody teorii nadezhnosti v raschetakh stroitel'nykh konstruktsiyâ€, Marshrut, (2006), 620p.
[8] Pichugin S., Vynnykov P., “Probabilistic calculation of the buried petroleum and gas pipelinesâ€, Problems of energy and nature use 2013, (2014), pp.108 - 115.
[9] Pichugin S, Zyma O, Vynnykov P, “Reliability Level of the Buried Main Pipelines Linear Part †Recent Progress in Steel and Composite Structures – Proceedings of the 13th International Conference on Metal Structures, ICMS 2016, (2016), pp: 551–558. DOI: 10.1201/b21417-76
[10] Zotsenko, M., Vynnykov, Y., Doubrovsky, M., Oganesyan, V., Shokarev, V., Syedin, V., Meshcheryakov, G. (2013). Innovative solutions in the field of geotechnical construction and coastal geotechnical engineering under difficult engineering-geological conditions of ukraine. Paper presented at the 18th International Conference on Soil Mechanics and Geotechnical Engineering: Challenges and Innovations in Geotechnics, ICSMGE 2013, 32645-2648.
[11] Zotsenko, M., Vynnykov,Y., Lartseva, I. & Sivitska,S. (2018) Ground base deformation by circular plate peculiarities Paper presented at the MATEC Web of Conferences, 230 https://doi.org/10.1051/matecconf/201823002040
-
Downloads
-
How to Cite
Nesterenko Sr., T., Lartseva, I., Kaliuzhnyi, A., & Yaholnyk, A. (2018). Probabilistic Aspects of Main Oil and Gas Pipelines Connections Calculation. International Journal of Engineering & Technology, 7(4.8), 36-40. https://doi.org/10.14419/ijet.v7i4.8.27210Received date: 2019-02-11
Accepted date: 2019-02-11
Published date: 2018-10-13