Analysis influence factors of domination, competency and interpersonal skill in the stakeholder interaction to infrastructure project success

  • Authors

    • Heru Bayuaji Sanggoro Mercu Buana University
    • Nunung Widyaningsih Mercu Buana University
    • Bambang P. K. Bintoro Bakrie University
    2020-02-07
    https://doi.org/10.14419/ijet.v9i1.30153
  • Stakeholders Interaction, Infrastructure Project, Interpersonal Skills, Domination, and Feudalism Culture.
  • Abstract

    Project is picture of interaction model from various interests in social communication among the stakeholders. Stakeholders interaction factors can be influenced by domination and competencies beside their interpersonal skills. This research based on samples of respondents from East Java and West Sumatra provinces, Indonesia, which have similar social behavior and socio-cultural strength. Subject of research focused on three main project’s stakeholders, which will be analyzed by partial least square-structural equation model (PLS-SEM). The result of analysis shows that domination factor has the greatest influence to infrastructures project implementation. It means that influence of feudalism cultural heritage remain affecting to local people character and work culture. However, respondents from East Java consider competency as a significant variable which influences the infrastructure project success. West Sumatera respondents are the opposite, where competency is not a significant variable to the project success directly. Meanwhile, interpersonal skill can be good mediation variable for domination and competency to the project success in the West Sumatra, but it is not good enough to mediate domination to project success in the East Java. Thus, it can be concluded that West Sumatra respondents have a more feudal interaction style than stakeholders in East Java.

     

     

  • References

    1. [1] Bonnafous-Boucher, Maria & Jacob Dahl Rendtorff. 2012. Stakeholder Theory: A Model for Strategic Management. SpringerBriefs in Ethics. Swiss.

      [2] Buhrmester, Duane., Wyndol Furman, Mitchell T. Wittenberg, Harry T. Reis. 1988. “Five Domains of Interpersonal Competence in Peer Relationshipsâ€. Journal of Personality and Social Psychology. Vol. 55, No. 6, pp. 991-1008. https://doi.org/10.1037/0022-3514.55.6.991.

      [3] Chandra, Herry Pintardi., Indarto, I Putu Artama Wiguna & Peter Kaming. 2011. “Peran Kondisi Pemangku Kepentingan Dalam Keberhasilan Proyekâ€. Jurnal Manajemen dan Kewirausahaan. Vol. 13, No. 2, pp. 135-150. https://doi.org/10.9744/jmk.13.2.135-150.

      [4] Chandra, Herry Pintardi., Indarto, I Putu Artama Wiguna & Peter F. Kaming. 2011. “Impact of Stakeholder Psychological Empowerment on Project Successâ€. The Journal for Technology and Science. Vol. 22, No. 2, pp. 65-73. https://doi.org/10.12962/j20882033.v22i2.63.

      [5] Cleland, David I. 1994. Project Management: Strategic Design and Implementation. 2nd Edition. McGraw-Hill Book Co. Singapura.

      [6] Doloi, Hemanta. 2012. “Assessing Stakeholders†Influence on Social Performance of Infrastructure Projectsâ€. Facilities. Vol. 30, pp. 531-550. https://doi.org/10.1108/02632771211252351.

      [7] Ekung, S.B., E. Okonkwo, I. Odesola. 2014. “Factors Influencing Construction Stakeholders†Engagement Outcome in Nigeriaâ€. International Letters of Natural Sciences. Vol. 20, pp. 101-114. https://doi.org/10.18052/www.scipress.com/ILNS.20.101.

      [8] El-Sawalhi, Nabil Ibrahim & Salah Hammad. 2015. “Factors affecting stakeholder management in construction projects in the Gaza Stripâ€. International Journal of Construction Management. Vol. 15, No. 2, pp. 157-169. https://doi.org/10.1080/15623599.2015.1035626.

      [9] Eyiah-Botwe, E., Aigbovboa, C.O., Thawal, W.D. 2016. “Critical Success Factors for Enhanced Stakeholder Management in Ghanaâ€. Socioeconomica – The Scientific Journal for Theory and Practice of Socio-economica Development. Vol. 5, No. 10, pp. 153-170.

      [10] Ghozali, Imam. 2014. Structural Equation Modeling: Metode Alternatif dengan Partial Least Squares (PLS). 4th Edition. Badan Penerbit Universitas Diponegoro. Semarang.

      [11] Gunduz, Murat., and Mohammed Ali Yahya. 2018. “Analysis of Project Success Factors in Construction Industryâ€. Technological and Economic Development of Economy. Vol. 24, No. 1, pp. 67-80. https://doi.org/10.3846/20294913.2015.1074129.

      [12] Hermansyah, Agung. 2018. “Pembangunan Infrastruktur dan Partisipasi Masyarakatâ€, accessed date 18 April 2019, https://news.detik.com/kolom/d-4021236/pembangunan-infrastruktur-dan-partisipasi-masyarakat.

      [13] Himawan, Furqon Ulya. 2018. “Pembangunan Bandara Internasional Yogyakarta dituduh ganggu lingkunganâ€, accessed date 18 April 2019, https://www.bbc.com/ indonesia/majalah-44020249.

      [14] Hurlock, E.B. 2000. Development psychology: a life span approach. Translated by Istiwidayati. Erlangga. Jakarta.

      [15] Idrus, Muhammad. 2009. “Kompetensi Interpersonal Mahasiswaâ€. UNISIA. Vol. XXXII, No. 72, pp. 171-184. https://doi.org/10.20885/unisia.vol32.iss72.art5.

      [16] Karina, S.M. & Suryanto. 2012. “Pengaruh Keterbukaan Diri terhadap Penerimaan Sosial pada Anggota Komunitas Backpacker Indonesia Regional Surabaya dengan Kepercayaan terhadap Dunia Maya sebagai Intervening Variabelâ€. Jurnal Psikologi Kepribadian dan Sosial Universitas Airlangga Surabaya. Vol. 1, No. 02, pp. 1-8.

      [17] Kotler, Philip & Kevin Lane Keller. 2009. Manajemen Pemasaran. 13th Edition, Book 1. Erlangga. Jakarta. https://doi.org/10.1088/1742-6596/1114/1/012135.

      [18] Marleno, R.; Surjono S, Wateno O, Muhammad IS, Dahlan A. 2018. “The Influence of Stakeholder Factors Affecting the Success of Construction Project in Indonesiaâ€. IOP Conf. Series: Journal of Physics. Conf. Series 1114 012135, pp. 1 – 10.

      [19] McElroy, B. and Mills, C. 2007. Managing Stakeholder in Turner, J.R. (Ed), Gower Handbook of Project Management (page: 757-775). Fourth Edition. Gower Publishing Limited. New Hampshire.

      [20] Mitchell K. Ronald, Bradley R. Agle, Donna J. Wood. 1997. “Toward a Theory of Stakeholder Identification and Salience: Defining the Principle of Who and What Really Countsâ€. The Academy of Management Review. Vol. 22, No. 4, pp. 853-886. https://doi.org/10.5465/amr.1997.9711022105.

      [21] Najah, Aulia and Darmawan Pontan. 2018. “Identifikasi Peringkat Faktor Penyebab Keterlambatan Konstruksi Pada Pelaksanaan Pembangunan Jalan Tolâ€. Seminar Nasional Cendekiawan ke-4 Tahun 2018. Book 1: Teknik, Kedokteran Hewan, Kesehatan, Lingkungan dan Lanskap, pp. 133 – 140.

      [22] Neville, Benjamin A., Bullet Menguc, Simon J. Bell. 2003. “Stakeholder Salience Reloaded: Operationalising Corporate Social Responsibilityâ€. ANZMAC, Conference Proceedings Adelaide. pp.: 1883-1889.

      [23] Nguyen, N.H., Skitmore, M. And Wong, J.K.W. 2009. “Stakeholder Impact Analysis of Infrastructure Project Management in Developing Countries: A Study of Perception of Project Managers in State-Owned Engineering Firm in Vietnamâ€. Construction Management and Economics. Vol. 27, No. 11, pp. 1129-1140. https://doi.org/10.1080/01446190903280468.

      [24] Nguyen, T.S. & Mohamed, S., “Stakeholder Management in Complex Projectâ€. In: The 7th World Construction Symposium 2018 : Built Asset Sustainability : Rethinking Design, Construction and Operation, 29 June – 01 July 2018. Colombo, Sri Lanka, pp. 497-506.

      [25] Olander, Stefan. 2003. “External Stakeholder Management in the Construction Processâ€. Licentiate Dissertation. Department of Building and Architecture, Division of Construction Management. Lund Institute of Technology, Lund University. Swedia.

      [26] PMI. 2018. Pedoman Kerangka Ilmu Manajemen Proyek (PMBOK Guide). 6th Edition. PMI Indonesia Chapter. Jakarta.

      [27] Rathenam, B. D. C., and N. L. Dabup. 2017. “Impact of Community Engagement on Public Construction Project – Case Study of Hammanskraal Pedestrian Bridge, City of Tshwane, South Africaâ€. Universal Journal of Management. Vol. 5, No. 9, pp. 418-428. https://doi.org/10.13189/ujm.2017.050902.

      [28] Rezy, Fakhri. 2018. “Banyak Kecelakaan Konstruksi, Indonesia Kekurangan Insinyur dengan Sertifikat Kompetensi Profesionalâ€, accessed date 4 November 2019, https://economy.okezone.com/read/2018/02/21/320/1862467/ banyak-kecelakaan-konstruksi-indonesia-kekurangan-insinyur-dengan-sertifikat-kompetensi-profesional.

      [29] Ritzer, George and Douglas J. Goodman. 2009. Teori Sosiologi. 3rd Edition. Kreasi Wacana. Yogyakarta.

      [30] Rosadi, Dede. 2017. “Keterlambatan Proyek “Penyakit†Tiap Tahunâ€, accessed date 18 April 2019, https://aceh.tribunnews.com/2017/12/19/keterlambatan-proyek-penyakit-tiap-tahun.

      [31] Rudy, Alsadad. 2013. “Ini Alasan Warga Menolak Jalur Layang MRTâ€, accessed date 18 April 2019, https://www.megapolitan.kompas.com/read/2013/05/02/23010571/Ini.Alasan.Warga.Menolak.Jalur.Layang.MRT.

      [32] Safrial, Masimin, Anita Rauzana. 2017. “Analisis Pengaruh Faktor-Faktor Kompetensi Project Manager Terhadap Keberhasilan Proyek Konstruksi Sungai Pada Dinas Pengairan Acehâ€. Jurnal Teknik Sipil Universitas Syiah Kuala. Vol. 6, No. 3, pp. 317-328.

      [33] Soeharto, Iman. 1997. Manajemen Proyek : dari konseptual sampai operasional. 3rd Edition. Erlangga. Jakarta.

      [34] Tuuli, M.M. & Rowlingson, S. 2009. Performance Consequences of Psychological Empowerment. Journal of Construction Engineering and Management, 135(12): 1334 – 1347. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000103.

      [35] Utomo, Wahyu. 2017. “Tantangan Pembangunan Infrastruktur di Indonesiaâ€, accessed date 18 April 2019, https://kppip.go.id/opini/tantangan-pembangunan-infrastruktur-indonesia/.

      [36] Waghmare, Yogita M., Nikhil Bhalero, S.V. Wagh. 2016. “Analysis of the Factors Affecting the Stakeholder Management Process in Building Construction Projectâ€. International Journal of Innovative Studies in Science and Engineering Technology (IJISSET). Vol. 2, No. 7, pp. 48-56.

      [37] Wiguna, I Putu Artama & Herry Pintardi Chandra. 2014. “Pengelolaan Pemangku Kepentingan Dalam Upaya Peningkatan Inovasi Kinerja Proyekâ€. APMMI 1 MMT ITS.

      [38] Yang, Jing., Geoffrey Qiping Shen, Manfong Ho, Derek S. Drew, and Albert P. C. Chan. 2009. “Exploring Critical Success Factors For Stakeholder Management in Construction Projectsâ€. Journal of Civil Engineering Management. Vol. 15, No. 4, pp. 337-348. https://doi.org/10.3846/1392-3730.2009.15.337-348.

      [39] Yang, Jing., Geoffrey Qiping Shen, Manfong Ho, Derek S. Drew, Xialong Xue. 2010. “Stakeholder management in construction : An empirical study to address research gaps in previous studiesâ€. International Journal of Project Management, xx: 1-11.

      [40] Yitmen, I. 2014. “The Influence of Cross-Cultural Communication on Stakeholder Management Process in International Construction Project : Turkish Stakeholders’ Perspectiveâ€. International Journal of Civil Engineering. Vol. 13, No. 2, pp.179-190.

  • Downloads

  • How to Cite

    Bayuaji Sanggoro, H., Widyaningsih, N., & P. K. Bintoro, B. (2020). Analysis influence factors of domination, competency and interpersonal skill in the stakeholder interaction to infrastructure project success. International Journal of Engineering & Technology, 9(1), 164-174. https://doi.org/10.14419/ijet.v9i1.30153

    Received date: 2019-11-19

    Accepted date: 2019-11-30

    Published date: 2020-02-07