Factors affecting the continuation of contractor participation in the tender process for the construction services project at the center for policy research and development and application of technology – research and development agency ministry of pub
-
2020-05-07 https://doi.org/10.14419/ijet.v9i2.30594 -
Participate in the Tender Process, Ability of Contractor, Project Characteristic, and Implementation of New Technology. -
Abstract
The application of new technology as a result of research and development carried out by the Research and Development Agency of the Ministry of Public Works and Public Housing is one of the efforts for technological needs in infrastructure development. The implementation of technology implementation activities still faces many obstacles, one of which is the tender process. Project Characteristics Factors, Capability of Contractors and Application of New Technology can influence whether the contractor will continue or stop the tender process. This research is based on a sample of respondents from related parties including goods / service providers (contractors), work owners and groups of goods / services procurement units. The results of the data obtained were analyzed with the partial least-squares structural equation model (PLS-SEM). The analysis shows that the ability of the Contractor has the greatest influence on the Tender Process. This means that the contractor's resources are the main force to carry out the project so that it is not too dependent on other parties. Thus, it can be concluded that the consideration of ownership of the contractor's resources becomes a factor for the contractor to continue the tender process that he follows by making an offer. Because with its capital and equipment, the contractor will be able to offer more efficiently.
Â
-
References
[1] Abidin. Said Zainal. 2012. Kebijakan Publik. Jakarta: Salemba Humanika.
[2] Adrian. Sutedi. 2012. Good Corporate Governance. Jakarta: Sinar Grafika.
[3] Alfian Malik. 2010. Pengantar Bisnis Jasa Pelaksana Konstruksi. Yogyakarta: Andi Offset.
[4] Andrianto. Nico. 2007. Transparasi dan Akuntabilitas Publik melalui e-Government. Malang: Bayumedia Publishing.
[5] Arrowsmith S. 2004. Public Procurement: An Appraisal of the UNCITRAL Model Law as a Global Standard. International Law & COMPQuarterly. https://doi.org/10.1093/iclq/53.1.17.
[6] Bahagia Nur. 2011. Senarai Pengadaan Barang/Jasa Pemerintah: Site. Pengadaan Publik dan Cakupannya. Jakarta: Jurnal Pengadaan LKPP.
[7] Bambang Prasetyo dan Lina Miftahul Jannah. 2010. Metode Penelitian Kuantitatif: Teori dan Aplikasi. Jakarta: Raja Grafindo Persada.
[8] Benny Kurniawan. 2012. Metodologi Penelitian. Tangerang Selatan: Hak Cipta.
[9] Brandon-Jones. A. & Carey. S. (2011). The Impact of User-Perceived e-Procurement Quality on System and Contract Compliance. International Journal of Operations & Production Management. https://doi.org/10.1108/01443571111111928.
[10] Budi Susetyo and Tin Budi Utami. 2017. Bidding Cost Evaluation with Fuzzy Methods on Building Project in Jakarta. AIP Conference Proceedings 1903, 070004 (2017); https://doi.org/10.1063/1.5011573.
[11] Chow H.K.H., Choy K.L., Lee W.B. and Chan, F.T.S., 2005. Design of knowledge-based logistics strategy system. Experts system with Applications. https://doi.org/10.1016/j.eswa.2005.04.001.
[12] Christopher & Schooner. 2007. Incrementalism: Reoding the Impediemnts to a Global Public Procurement Market. Journal of International Law.
[13] Dalkey, N. C. 1972. The Delphi method: An experimental study of group opinion. In N. C. Dalkey, D. L. Rourke, R. Lewis, & D. Snyder (Eds.). Studies in the quality of life: Delphi and decision-making (pp. 13-54). Lexington, MA: Lexington Books.
[14] Dwi. Bagas. dkk. 2017. Pengaruh Competitive Bidding pada Pekerjaan Konstruksi terhadap Penawaran Pemenang Tender dalam e-Procurement LPSE PT. PLN (PERSERO). Purwokerto.
[15] Egbu C. Vines M. and Tookey J. (2004). The Role of Knowledge Management in e-Procurement Initiatives for Construction Organisations. ARCOM Proceedings Twentieth Annual Conference 2004 (Khosrowshami.F. editor) Volume 1. 661 – 67.
[16] Ghozali. Imam. 2014. Structural Equation Modeling. Metode Alternatif dengan Partial Least Square (PLS). Edisi 4. Semarang: Badan Penerbit Universitas Diponegoro.
[17] Gene Rowe. George Wright. 1999. The Delphi technique as a forecasting tool: issues and analysis. International Journal of Forecasting. Volume 15, Issue 4, October 1999, Pages 353-375. https://doi.org/10.1016/S0169-2070(99)00018-7.
[18] Guritno. 1992. Kamus Ekonomi Bisnis Perbankan Inggris – Indonesia. Gadjahmada University Press: Yogyakarta. Hal 24.
[19] Gray. Clive. dkk. 1993. Pengantar Evaluasi Proyek. Jakarta: Penerbit Gramedia Pustaka Utama. Jakarta. (Penyunting Mia 2009).
[20] Harold A. Linstone, Murray Turoff. 1975. The Delphi method: techniques and applications. Addison-Wesley Pub. Co.
[21] Hendrawan. Hendra. 2018. Faktor yang Mempengaruhi Keberhasilan Penerapan Teknologi Bidang Jalan dengan Kontrak Rancang Bangun. Bandung: Media komunikasi Teknik Sipil. https://doi.org/10.14710/mkts.v24i1.18376.
[22] Handoko, T. Hani. 2010. Manajemen Personalia & Sumber Daya Manusia. BPFE-Yogyakarta.
[23] Hanke, J. E., and D.W. Wichern. 2005. Business Forecasting. 8th ed, Pearson Prentice Hall.
[24] Helmer O. 1983. Looking Forward: A Guide to Futures Research Sage Publications. Beverly Hills.
[25] Henry Simamora. 2000. Manajemen Pemasaran Internasional (jilid 1). Hal. 411. Jakarta: Salemba Empat.
[26] Iman Soeharto. 1999. Manajemen Proyek: Dari Konseptual sampai Operasional. Hal 22. Jakarta: Penerbit Erlangga.
[27] Kalakota. Ravi and Marcia Robinson. 2001. e-Business 2.0: Roadmap for Success. Addison Wesley. Longman Inc.Cambridge. Massachusse.
[28] Keputusan Dewan Lembaga Pengembangan Jasa Konstruksi Nasional Nomor: 75/KPTS/LPJK/D/X/2002 tentang Pedoman Sertifikasi dan Registrasi Badan Usaha Jasa Pelaksana Konstruksi Nasional.
[29] Ketut. Suditpa. 2016. Analisis Faktor yang Mempengaruhi Kontraktor dalam Pengambilan Keputusan pada Pelelangan Pemerintah dengan Sistem e-Procurement. Bali: Universitas Udayana.
[30] LPJK. 2008. Jasa Kontruksi. Jakarta: Lembaga Pengembangan Jasa Kontruksi.
[31] Malik. Alfian. 2010. Pengantar Bisnis Jasa Pelaksana Konstruksi. Yogayakrta: Andi Offset. (Penyunting Zaenal Arifin 2012).
[32] Mawardi Amin. 2017. Development of Cost Estimation Model for Residential Building. International Journal of Civil and Structural Engineering Research ISSN 2348-7607 (Online) Vol. 5, Issue 1, pp: (1-4), Month: April - September 2017, Available at: www.researchpublish.com.
[33] Morledge, R. And Adnan, H., 2003. Application of Delphi methods to research on critical success factors in joint venture projects in Malaysia. In: Proceedings of the second international conference on construction in the 21st century: sustainability and innovation in management and technology, Hong Kong.
[34] Nadisa. Mayun. dkk. 2014. Analisis Faktor-faktor yang Mempengaruhi Gagal Lelang Pengadaan Barang dan Jasa Pemerintah secara Elektronik (e-Procurement) di Kabupaten Badung. Bali: Jurnal Spektran.
[35] Nightisaba, Ita Akyuna. 2009. Jurnal Siasat Bisnis. Vol 13 No 2. Persepsi Pengguna Layanan Pengadaan Barang dan Jasa Pada Pemerintah Kota Yogyakarta Terhadap Implementasi Sistem e-Procurement. Terdapat pada http://journal.uii.a.id/index.php/JSB/article/view/2018/1772.
[36] Noferi. Sayfran. 2017. Analisis Faktor Penyebab Calon Penyedia Jasa Melakukan Pendaftaran Lelang Tetapi Tidak Melanjutkan Memasukan Dokumen Penawaran Pada Pengadaan Jasa Konstruksi Pemerintah. Bandung: Jurnal Infrastruktur. https://doi.org/10.20885/jsb.vol13.iss2.art3.
[37] Peraturan Presiden Republik Indonesia Nomor 16 Tahun 2018 tentang Pengadaan Barang dan Jasa Pemerintah.
[38] Peraturan Menteri Pekerjaan Umum Nomor 07/PRT/M/2012 tentang Penyelenggaraan Penelitian dan Pengembangan.
[39] Peraturan Lembaga Jasa Konstruksi Nomor: 11a Tahun 2008 tentang Registrasi Usaha Jasa Konstruksi.
[40] Philip Kotler dan Kevin Lane Keller. 2007. Manajemen Pemasaran. Jilid II. Ed. 12. Terj. Benjamin Molan. Jakarta: Prenhallindo. (Penyunting Saliq NC 2017).
[41] Pujawan. I. N. 2005. Supply Chain Management (1stEdition ed.). Indonesia:Gunawidya.
[42] Respawan. Made. dkk. 2017. Analisis Faktor Yang Mempengaruhi Partisipasi dan Nilai Penawaran Peserta Lelang Elektronik (e-Procurement) Jasa Konstruksi di Kabupaten Buleleng. Bali: Jurnal Spektran. https://doi.org/10.24843/SPEKTRAN.2017.v05.i01.p01.
[43] Ricky W. Griffin. Ronald J. Ebert. 2006. Bisnis (Terjemahan Sita Wardhani). Surabaya: Erlangga. (Penyunting Saliq NC 2017).
[44] Simon R. Croom and Alistair Brandon-Jones. 2005. Key Issues in e-Procurement: Procurement Implementation and Operation in the Public Sector. Journal of Public Procurement. Volume 5. Issue 3. 367-387. https://doi.org/10.1108/JOPP-05-03-2005-B004.
[45] Skutsch, Margaret Hall, Diana. 1973. Delphi: Potential uses in educational planning. Project Sims u-School: Chicago Component.
[46] Sudaryono. 2017. Metodologi Penelitian. Edisi 1. Jakarta: Rajawali Pers.
[47] Sugiyono. 2017. Metode Penelitian Kuantitatif. Kualitatif. dan R&D. Cet. Ke-26. Bandung: Alfabeta.
[48] Panayiotou. N. A. Gayialis. S. P. & Tatsiopoulos. I. P. 2004. An e-Procurement System for Governmental Purchasing. International Journal of Production Economics. Volume 90. 79-102. https://doi.org/10.1016/S0925-5273(03)00103-8.
[49] Teo. T. S. Lin. S. & Lai. K.-h. 2009. Adopters and non-Adopters of e-Procurement in Singapore: An Empirical Study. Volume 37. 972-987 Omega. https://doi.org/10.1016/j.omega.2008.11.001.
[50] Tim Peneliti. 2017. Dokumen Output Replikasi Perdana Teknologi Asbuton. Surabaya: Balai Penelitian dan Pengembangan Penerapan Teknologi Jalan dan Jembatan.
[51] Tim Peneliti. 2017. Laporan Akhir Penerapan Teknologi di KSPN Danau Toba. Yogyakarta: Balai Penelitian dan Pengembangan Penerapan Teknologi Permukiman.
[52] Undang-Undang Nomor 2 Tahun 2017 tentang Jasa Kontruksi.
[53] Whellwright, S. C., and S. Makridakis. 1980. Forecasting Methods for management, 3th ed.
[54] William J. Stanton. 1996. Prinsip Pemasaran. Jilid 1 Edisi VII (Terjemahan Yohanes Lamarto). Jakarta: Erlangga. (Penyunting Saliq NC 2017).
[55] Wulfram I. Ervianto: 2002. Proyek Kontruksi. Malang. Halaman 3. (Penyunting D Kamelia 2017).
-
Downloads
-
How to Cite
Arteti, N., ., S., & Susetyo, B. (2020). Factors affecting the continuation of contractor participation in the tender process for the construction services project at the center for policy research and development and application of technology – research and development agency ministry of pub. International Journal of Engineering & Technology, 9(2), 501-508. https://doi.org/10.14419/ijet.v9i2.30594Received date: 2020-04-06
Accepted date: 2020-04-27
Published date: 2020-05-07