Risk analysis of construction planning that affecting quality and time control in the apartment development performance using PLS - SEM method (case study in apartments in Tangerang)

  • Authors

    • Angga Sumantri STIA Menara Siswa
    • Nunungwidyaningsih .
    • Bambang P. K. Bintoro
    2020-07-01
    https://doi.org/10.14419/ijet.v9i2.30644
  • Apartment, Risk, Quality Control, Time Control, Management Performance.
  • Large-scale projects, especially construction projects, have a large degree of difficulty in planning and controlling. For the project to work, a rigorous project planning and control analysis is required. This study aims to identifythe relationship between construction planning risk, quality control, time control, and management performance. Three apartment development projects in the Tangerang area were researched and 58 respondents were selected as the research sample. Based on the results of PLS SEM analysis, it was found that the risk of construction planning has a positive and significant effect on quality control and also on time control. Project control in terms of quality and time has a positive influence on management performance in apartment construction. If the company can carry out quality control and time correctly, then management performance will increase, but the performance improvement is not significant.

     

     

  • References

    1. [1] R. V. Dandage, S. S. Mantha, and S. B. Rane, “Strategy development using TOWS matrix for international project risk management based on prioritization of risk categories,†International Journal of Managing Projects in Business, vol. 12, no. 4, pp. 1003-1029, 2019. https://doi.org/10.1108/IJMPB-07-2018-0128.

      [2] J. Crispim, L. H. Silva, and N. Rego, “Project risk management practices: the organizational maturity influence,†International Journal of Managing Projects in Business, vol. 12, no. 1, pp. 187-210, 2019. https://doi.org/10.1108/IJMPB-10-2017-0122.

      [3] H. A. Vu, V. H. Cu, L. X. Min, and J. Q. Wang, “Risk analysis of schedule delays in international highway projects in Vietnam using a structural equation model,†Engineering, Construction and Architectural Management, vol. 24, no. 6, pp. 1018-1039, 2017. https://doi.org/10.1108/ECAM-06-2016-0138.

      [4] S. Zailani, H. A. Md. Ariffin, M. Iranmanesh, S. Moeinzahed, and M. Iranmanesh, "The moderating effect of project risk mitigation strategies on the relationship between delay factors and construction project performance", Journal of Science and Technology Policy Management, vol. 7, no.3, pp. 346-368, 2016. https://doi.org/10.1108/JSTPM-12-2015-0041.

      [5] A. Rostami and C. F. Oduoz, “Key risks in construction projects in Italy: contractors' perspective,†Engineering, Construction and Architectural Management, vol. 24, no. 3, pp. 451-462, 2017. https://doi.org/10.1108/ECAM-09-2015-0142.

      [6] L. Liu., “How does strategic uncertainty and project sponsorship relate to project performance? A study of Australian project managers,†Management Research News, vol. 32, no. 3, pp. 239-253, 2009. https://doi.org/10.1108/01409170910943101.

      [7] P.J. Edwards and P.A. Bowen, “Risk and risk management in construction: a review and future directions for research Engineering,†Construction and Architectural Management, vol. 5, no. 4, pp. 339 – 349, 1998. https://doi.org/10.1046/j.1365-232X.1998.54072.x.

      [8] C. Besner and B. Hobbs, “The paradox of risk management; a project management practice perspective,†International Journal of Managing Projects in Business, vol. 5, no. 2, pp. 230 – 247, 2012. https://doi.org/10.1108/17538371211214923.

      [9] E. Sinesilassie, S. Tabish, and K. Jha, “Critical factors affecting schedule performance: a case of Ethiopian public construction projects – engineers’ perspective,†Engineering, Construction and Architectural Management, vol. 24, no. 5, pp. 757-773, 2017. https://doi.org/10.1108/ECAM-03-2016-0062.

      [10] P. Kumar and V. K. Baradiya, "Construction Risk Assessment through Partial Least Square Technique," Proceedings of Recent Advances in Interdisciplinary Trends in Engineering & Applications (RAITEA) 2019. https://doi.org/10.2139/ssrn.3353125.

      [11] A. Memon and I. Rahman, “Analysis of cost overrun factors for small scale construction projects in Malaysia using PLS-SEM method†Modern applied science, vol. 7, no. 8, 2013. https://doi.org/10.5539/mas.v7n8p78.

      [12] N.S. Asmarantaka, “Analisis Risiko Yang Berpengaruh Terhadap Kinerja Proyek Pada Pembangunan Hotel Batiqa Palembang,†Journal of Civil and Environmental Engineering, vol. 2, no. 3, 2014.

      [13] Iribaram, F. Wati, and M. Huda, "Analisa Resiko Biaya Dan Waktu Konstruksi Pada Proyek Pembangunan Apartemen Biz Square Rungkut Surabaya," axial: jurnal rekayasa dan manajemen konstruksi, vol. 6, no. 3, pp. 141-154, 2019.

      [14] M. R. A. Simanjuntak and B. Garundita, "Identifikasi Risiko Tahap Perencanaan Proyek Dalam Meningkatkan Kinerja Pembiayaan Proyek Apartemen X Semarang," Konferensi Nasional Teknik Sipil 12, Batam, 2018.

      [15] M. Sobirin, “Kinerja Proyek Konstruksi Bangunan Gedung Di Pengaruhi Oleh Beberapa Faktor Seperti Sumber Daya Manusia, Sumber Daya Alat Dan Sumber Daya Material,†Jurnal Sains dan Teknologi Teknik Utama, vol.11, no. 2, pp. 117-132, 2016.

  • Downloads

  • How to Cite

    Sumantri, A., ., N., & P. K. Bintoro, B. (2020). Risk analysis of construction planning that affecting quality and time control in the apartment development performance using PLS - SEM method (case study in apartments in Tangerang). International Journal of Engineering & Technology, 9(2), 546-551. https://doi.org/10.14419/ijet.v9i2.30644