[1]
Al-Hazim, N. and abusalem, zaydoun 2015. Delay and cost overrun in road construction projects in Jordan. International Journal of Engineering & Technology. 4, 2 (Apr. 2015), 288–293. DOI:https://doi.org/10.14419/ijet.v4i2.4409.