[1]
Rezazadeh Kermani, E. and Momeni, M. 2016. Simultaneous management and control on cost and time in the project development through fuzzy logic to risk management. International Journal of Engineering & Technology. 5, 4 (Nov. 2016), 135–138. DOI:https://doi.org/10.14419/ijet.v5i4.6599.