[1]
Joseph Kalayathankal, S. et al. 2018. A modified fuzzy approach to prioritize project activities. International Journal of Engineering & Technology. 7, 2.6 (Mar. 2018), 158–162. DOI:https://doi.org/10.14419/ijet.v7i2.6.10143.