[1]
J, R. et al. 2018. A Study on Multiple Crew Based Productivity Scheduling Method in Construction Projects. International Journal of Engineering & Technology. 7, 2.12 (Apr. 2018), 454–458. DOI:https://doi.org/10.14419/ijet.v7i2.12.11516.