[1]
Umeesh Kumar Suppramaniam, S. et al. 2018. Causes of delay in the construction phase of oil and gas projects in Malaysia. International Journal of Engineering & Technology. 7, 2.29 (May 2018), 203–209. DOI:https://doi.org/10.14419/ijet.v7i2.29.13318.