[1]
Mykytas, M. et al. 2018. Models, Methods and Tools of Optimizing Costs for Development of Clusterized Organizational Structures in Construction Industry. International Journal of Engineering & Technology. 7, 3.2 (Jun. 2018), 250–254. DOI:https://doi.org/10.14419/ijet.v7i3.2.14414.