[1]
Wai Tan, H. et al. 2018. Work-in-Progress Inventory Control Case Study in Lean Management. International Journal of Engineering & Technology. 7, 3.4 (Jun. 2018), 181–187. DOI:https://doi.org/10.14419/ijet.v7i3.4.16770.