[1]
Kim, J. and Won, J. 2018. Construction Period Analysis of HPC Method by PC Construction Project Cases in KOREA. International Journal of Engineering & Technology. 7, 3.7 (Jul. 2018), 440–443. DOI:https://doi.org/10.14419/ijet.v7i3.7.18901.