[1]
Abdul Rahman, I. et al. 2018. Risk Assessment of Time and Cost Overrun Factors throughout Construction Project Lifecycle: Pilot Study. International Journal of Engineering & Technology. 7, 3.20 (Sep. 2018), 717–723. DOI:https://doi.org/10.14419/ijet.v7i3.20.22980.