[1]
Hidayah Yahya, N. et al. 2018. Key Factors for Mitigating Contractor’s Claim on Loss and Expense Due to the Extension of Time in Public Projects: the Causes and Mitigation Measures. International Journal of Engineering & Technology. 7, 3.25 (Aug. 2018), 614–619. DOI:https://doi.org/10.14419/ijet.v7i3.25.17810.