[1]
Samundeeswari, D. et al. 2018. Expected Time to Recruitment for a Three Grade Manpower System with Bivariate Policy of Recruitment Using Geometric Process for Inter Decision Times. International Journal of Engineering & Technology. 7, 3.34 (Sep. 2018), 702–704. DOI:https://doi.org/10.14419/ijet.v7i3.34.19455.