[1]
Md. Ali, M. et al. 2018. Factors impeding the industrialized building system (IBS) implementation of building construction in Malaysia. International Journal of Engineering & Technology. 7, 4 (Sep. 2018), 2209–2212. DOI:https://doi.org/10.14419/ijet.v7i4.17863.