[1]
Bhat, R. et al. 2018. Reducing the Production Lead Time of an Industry Using Value Stream Mapping Integrated with Kaizen. International Journal of Engineering & Technology. 7, 4.41 (Dec. 2018), 21–23. DOI:https://doi.org/10.14419/ijet.v7i4.41.24291.