[1]
Rochman, K. and Susetyo, B. 2020. Improvement of cost performance accompanied by quality control using value engineering and six sigma methods in high-rise building project. International Journal of Engineering & Technology. 9, 2 (Jul. 2020), 560–567. DOI:https://doi.org/10.14419/ijet.v9i2.30880.