[1]
Ghani, U. and Hayat, M. 2020. Replenishment policy for an economic production quantity model considering rework and multiple shipments. International Journal of Engineering & Technology. 9, 3 (Aug. 2020), 758–763. DOI:https://doi.org/10.14419/ijet.v9i3.31034.